My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Universal Engineering Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Universal Engineering Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:06:57 AM
Creation date
8/21/2020 11:06:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Engineering Sciences | 19 <br />E. Qualification Information and Assigned Personnel <br />12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Steve Jaime, EI Project Manager <br />Universal Engineering Sciences, Inc. (Miami, Florida) <br />BS, Civil Engineering <br />MDX Central Blvd. Widening and Reconstruction Design-Build <br />(Miami-Dade County, FL) <br />Venetian Causeway Bridge Reconstruction <br />(Miami-Dade County, FL) <br />Port of Miami Tunnel and Access Roadways <br />(Miami-Dade County, FL) <br />NW 36th Street Bridge Reconstruction over the Miami River <br />(Miami-Dade, FL) <br />Broward County Mast Arm Conversion (Group 1 & Group 2) <br />(Miami-Dade County, FL) <br />The project included installing several sign structures along roadways for the proposed tunnel construction. Steve was a senior <br />drilled shaft inspector as well as responsible for oversight of all drilled shaft inspection operations, coordinating fi eld drilled <br />shaft inspections, reviewing paperwork for completeness and technical accuracy, tracking and reporting concrete cylinder <br />breaks and coordinating CSL testing on drilled shafts. <br />The project includes complete reconstruction of the NW 36th Street bascule bridge over the Miami River. Steve provided pile <br />driving inspection services on an as-needed basis for bridge construction. <br />The project included installation of mast arms for 33 intersections. Steve is responsible for coordinating fi eld drilled shaft <br />inspections and reviewing paperwork for technical accuracy. <br />N/A2019 <br />2015 <br />2014 <br />2015 <br />2018 <br />N/A <br />N/A <br />N/A <br />N/A <br />Steve served as a staff geotechnical engineer during the design and construction phases. Primary duties included test boring <br />layout, utility clearances, drafting, inspection of driven pile foundations and inspection of drilled shaft foundations. <br />The project includes construction of 32 54-inch diameter drilled shaft foundations for the new bridge. Steve is responsible for <br />coordinating fi eld drilled shaft inspections, reviewing paperwork for completeness and technical accuracy, tracking and reporting <br />concrete cylinder breaks, coordinating, and performing CSL testing on drilled shafts. <br />Engineer Intern, CTQP Drilled Shaft Inspector, CTQP Pile Driving Inspector, and CTQP Auger-Cast Pile Inspector <br />6 5 <br />• <br />• <br />• <br />• <br />•
The URL can be used to link to this page
Your browser does not support the video tag.