Universal Engineering Sciences | 20
<br />E. Qualification Information and Assigned Personnel
<br />12. NAME 13. ROLE IN THIS CONTRACT
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRMa. TOTAL
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />a.
<br />b.
<br />c.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />e.
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Barbara A. Valdes-Perez, PE Project Engineer 22
<br />On-Going
<br />On-Going
<br />2020
<br />2019
<br />On-Going
<br />N/A
<br />N/A
<br />N/A
<br />N/A
<br />N/A
<br />1
<br />Universal Engineering Sciences, Inc. - Miami, FL
<br />BS, Civil Engineering, Polytechnic Institute J.A. Echeverría Professional Engineer - FL
<br />Barbara has 22 years of varied experience in the fi eld of civil engineering that include 17 years in Geotechnical Engineer-
<br />ing and 5 years in Hydraulic Engineering. Her experience includes designing structures for hydraulic facilities, construction
<br />supervision work in small and large buildings, and major public works projects.
<br />I-395 Reconstruction Design-Build, FDOT D6
<br />(Miami-Dade, FL)
<br />I-95 3C Express Lanes Design-Build, FDOT D4
<br />(Miami-Dade, FL)
<br />Ocean Boulevard Residential Improvements
<br />(Miami, FL)
<br />Collins Avenue Pavement Confi rmation
<br />(Miami, FL)
<br />Florida Keys Electric Cooperative Exfi ltration Testing
<br />(Marathon, FL)
<br />Barbara serves as a staff engineer during the design and construction phases. Primary duties include test boring layout,
<br />utility clearance, drilling coordination, report writing, and rock core data analysis. Project includes the design of a signature
<br />bridge, segmental bridges, and viaduct bridges supported on auger-cast pile foundations.
<br />Barbara serves as a staff engineer during the design and construction phases. Primary duties include test boring layout,
<br />utility clearance, drilling coordination, report writing, and rock core data analysis. Project includes non-redundant drilled
<br />shaft foundations for 8 bridges, concrete and steel piling for conventional and category 2 bridges, roadway improvements,
<br />retaining walls, and sign structures.
<br />Barbara served as the staff Engineer and conducted geotechnical exploration for the residential home. The project included
<br />borehole percolation test and laboratory testing services. As the Geotechnical Project Engineer Barbara prepared reports that
<br />consisted of methods and procedures for fi eld sampling and testing.
<br />Barbara served as the staff Engineer. The project consisted of four standard Penetration Test (SPT) that provided data for pave-
<br />ment evaluation and four pavement cores that provided data for the asphalt and base thickness. Soil/rock samples were also
<br />recovered from the fi eld exploration program.
<br />UES provided Geotechnical exploration that consisted of two borehole exfi ltration tests at a depth of 15 feet below existing
<br />grades for use in drainage evaluation and design by others. Barbara serves as the Project Engineer.
<br />•
<br />•
<br />•
<br />•
<br />•
|