My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Universal Engineering Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Universal Engineering Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:06:57 AM
Creation date
8/21/2020 11:06:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Engineering Sciences | 21 <br />E. Qualification Information and Assigned Personnel <br />12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Melissa De La Rosa, EI Staff Engineer <br />Universal Engineering Sciences, Inc. (Miami, Florida) <br />BS, Environmental Engineering, University of Central Florida <br />SR 916/NE 135th Street at Arch Creek, G-58 Gate Replacement <br />and Refurbishment (Miami-Dade, FL) <br />E-6K77 I-95 (SR 9A) Roadway Reconstruction, CCTV Camera Poles <br />(Miami-Dade, FL) <br />E-6K77 I-95 (SR 9A) Roadway Reconstruction, DMS & Sign Structures <br />(Miami-Dade, FL) <br />T6338 SR 968 (East W. Flagler Street) Roadway Improvements <br />(Miami-Dade, FL) <br />T6337 SR 968 (W. Flagler Street) Roadway Improvements <br />(Miami-Dade, FL) <br />In this project, Melissa served as a staff geotechnical engineer during the design and construction phases. Primary duties <br />included test boring layout, utility clearances, drafting, and assisting with geotechnical reporting. <br />Melissa served as a staff geotechnical engineer during the vibration monitoring services. Primary duties included <br />scheduling and reporting. <br />In this project, Melissa served as a staff geotechnical engineer during the vibration monitoring services. Primary duties <br />included scheduling and reporting. <br />Melissa served as a staff geotechnical engineer during the design and construction phases. Primary duties included test <br />boring layout, utility clearances, drafting, and geotechnical reporting. <br />Melissa served as a staff geotechnical engineer during the design and construction phases. Primary duties included test <br />boring layout, utility clearances, drafting, and assisting with geotechnical reporting. <br />N/A2017 <br />2018 <br />2018 <br />2019 <br />2019 <br />N/A <br />N/A <br />N/A <br />N/A <br />4 4 <br />Melissa De La Rosa is a recent graduate who is responsible for coordinating all geotechnical fi eld work and preparing <br />geotechnical reports for both public and private sector projects. She also has experience with installation and recording data <br />from geotechnical instrumentation, including vibration monitors. <br />• <br />• <br />• <br />• <br />•
The URL can be used to link to this page
Your browser does not support the video tag.