My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Universal Engineering Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Universal Engineering Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:06:57 AM
Creation date
8/21/2020 11:06:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Engineering Sciences | 22 <br />E. Qualification Information and Assigned Personnel <br />12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Adam G. Kirk, PE Geotechnical Project Engineer <br />Universal Engineering Sciences, Inc. (Miami, Florida) <br />BS, Civil Engineering <br />BS, Physics <br />Professional Engineer - FL <br />Pile Driving Inspection Drilled Shaft Inspection, High-Strain Dynamic Pile Testing (HSDPT), EDC Certifi cation, and GPR <br />Certifi cation in BridgeScan and StructureScan Optical Systems <br />N/A2016 <br />2013 <br />2018 <br />2016 <br />2016 N/A <br />N/A <br />N/A <br />N/A <br />Overland 1-95 (Jacksonville, Florida) <br />SR 87 (Navarre, Florida) <br />Beachline (Orlando, Florida) <br />SR 415 (Sanford, Florida) <br />WDW BC-6 Tower Static Load Testing (Orlando, Florida) <br />Adam was responsible for certifying foundations for driven piles and drilled shafts, performing fi eld service <br />verifi cation testing including PDA, CSL, Thermal Integrity Profi ling (TIP), Mini-SID, Vibration Monitoring, Post <br />Grouting Monitoring, Statnamic Testing, and Osterberg Cells. <br />Adam performed both PDA and EDC services for FDOT to correlate various methods of dynamic testing during <br />pile driving operations. <br />Adam performed Static Load Testing on helical pier piles for a cellular tower. EOR responsible for designing the static <br />load test, performing the test, and analyzing the data. <br />Adam was responsible for testing and verifi cation of PDA, CSL, TIP, and Driven Pile and Drilled Shaft Logs. <br />Adam performed Vibration Monitoring for the contractor, pre/post condition surveys of surrounding structures. <br />14 10 <br />• <br />• <br />• <br />• <br />•
The URL can be used to link to this page
Your browser does not support the video tag.