My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Universal Engineering Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Universal Engineering Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:06:57 AM
Creation date
8/21/2020 11:06:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Engineering Sciences | 23 <br />E. Qualification Information and Assigned Personnel <br />12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Bobbie Villa <br />N/A <br />N/A <br />2016 <br />2015 <br />2016 <br />2016 <br />2019 <br />N/A <br />N/A <br />N/A <br />Project Manager <br />Venetian Causeway Bridge Reconstruction <br />(Miami-Dade, FL) <br />Sawgrass Mills Mall Signalized Intersections <br />(Miami-Dade, FL) <br />HEFT Roadway Improvements, from Eureka Drive to Caribbean Blvd. <br />(Miami-Dade, FL) <br />Broward County Mast Arm Conversion (Group 1) <br />(Broward County, FL) <br />T6220 Krome Avenue Reconstruction, From SW 8th to SW 88th Streets <br />(Miami-Dade, FL) <br />Bobbie is involved performing earthwork quality control for the contractor for both embankment and drainage backfi ll. <br />Included in this work is monitoring of surcharge embankment. <br />The project included installation of mast arms for one intersection. Bobbie was the lead drilled shaft inspector and <br />responsible for coordinating with all concrete fi eld personnel. <br />The project included installation of mast arms for 20 intersections. Bobbie was the lead drilled shaft inspector and <br />responsible for coordinating with all concrete fi eld personnel. <br />The project includes construction of 32 54-inch diameter drilled shaft foundations for the new bridge. Bobbie is the lead <br />drilled shaft inspector responsible for all shaft inspections, including coordinating with concrete fi eld technician, fi lling out <br />all FDOT inspection forms, fi lling out FDOT Excel spreadsheet for drilled shafts, and coordinating concrete breaks. <br />The project included installation of mast arms for one intersection. Bobbie was the lead drilled shaft inspector and <br />responsible for coordinating with all concrete fi eld personnel. <br />Universal Engineering Sciences, Inc. (Miami, Florida) <br />CTQP Drilled Shaft Inspector, CTQP Concrete Field Level 1, ACI Field Testing Technician Level 1, Earthwork Level 1, and <br />Nuclear Gauge Safety <br />7 6 <br />• <br />• <br />• <br />• <br />•
The URL can be used to link to this page
Your browser does not support the video tag.