Laserfiche WebLink
Page 30 <br />Qualification Information <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />Miami, Florida <br />(3) ROLE <br /> <br />Prime Consultant & Architect of Record <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />M.C. Harry & Associates, Inc. <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />9 <br />21. TITLE AND LOCATION (City and State) <br />A/E Planning and Design Services 22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014-2020 <br />CONSTRUCTION (if applicable) <br />2014-2020 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Miami <br />b. POINT OF CONTACT NAME <br />Jose Caldeira <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305-416-1243 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />M.C. Harry has been the Architect of Record for several City of Miami <br />projects including: (2016-Current) <br />Dinner Key Marina Dockmaster Facility: <br />The design and construction of a new, three story, Dockmaster Build- <br />ing serving the Coconut Grove Dinner Key Marina. It replaces the 40 <br />year undersized facility and provides a shaded commons area and pa- <br />tron parking on the first floor; customer services on the second floor; <br />and administrative offices on the third floor. <br />Const Cost 4,365,526.00 Completion 12/2016 <br />Richard Pope, City of Miami Project Manager 305-416-1285 <br /> <br /> <br />Dorsey Memorial Library Restoration: <br />Restoration/Reconstruction of the Dorsey Memorial Library located in <br />the heart of Overtown. <br />Const. Cost 918,502.05 Completion 12/2018 <br />Jose Caldeira, City of Miami Project Manager 305-416-1290 <br /> <br /> <br />City Hall Reroofing: <br />The Design, Permitting and construction administration for the roof re- <br />placement and lighting protection of City Hall Reroofing <br />Const. Cost 250,000.00 Completion 4/2018 <br />Jose Caldeira, City of Miami Project Manager 305-416-1290 <br /> <br /> <br />Past Projects also include: City of Miami Mounted Police Unit Stables <br />at Lummus Park, Melreese Golf Training Center, CRA Fire Station <br />No.2, <br />ARCHITECT