Laserfiche WebLink
78 <br />GUSTAVO ECKARDT, P.E. <br />Surveying Project Manager <br />Various Roadway Intersections Surveys, Miami-Dade County, FL - This project was to provide roadway <br />intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Eckardt was <br />tasked with managing the topographic surveys which required the completion of five separated Specific Purpose <br />Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the <br />proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required <br />to follow standards provided by the Client. Mr. Eckardt provided project coordination between client and survey <br />crew, and ensured all production was geared towards this project, with adequate staff levels, and deliver in a timely <br />manner to meet the aggressive schedule required in this project. Mr. Eckardt also conducted QA/QC reviews on <br />deliverables on this project. <br />Medley Fire rescue Facility Survey, Medley, Miami-Dade County, FL - This project was to replace the perimeter <br />fence after the existing fence was damaged by recent storm events. The project site was an existing and Active Fire <br />rescue Facility, of about 6.4 Acres, owned and maintained by Miami-Dade County. A specific purpose survey was <br />conducted by Mr. Eckardt was the project manager on this project and coordinated between survey crew, user <br />department and client. Mr. Eckardt also conducted QA/QC reviews on deliverables on this project. <br />South Bulkhead Repairs Bay 165 - 177, PortMiami, Miami, FL - The Work of this Project comprised the general <br />construction necessary to repair a portion of the bulkhead walls in the area of South bulkhead from Bays 165-177, <br />including the installation of king piles, concrete cap, marine fenders, water stations and mooring bollards. Mr. Eckardt <br />was responsible for the Topographic Survey, Civil Engineering, Utility Coordination, and Construction support <br />required for this Project. Activities performed included Survey, Drainage Design, Drainage Calculations, utility <br />investigation, water main and water station design, permitting Support, Bid Support and Engineering During <br />Construction Services. <br />Miami-Dade Water and Sewer Utility Atlas Update and GIS Implementation Miami Springs, FL - Mr. Eckardt <br />was the Project Manager for this Miami-Dade Water and Sewer Department (WASD) project to provide support <br />services for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of <br />Miami Springs acquired utilities. The main objective of this project was to compile all As-Built Information related to <br />all water and sewer assets of Miami Springs, an area of 1,900 Acres, and upload the information digitally into the <br />WASD GIS System. Mr. Eckardt directed a six full time GIS Specialists team working at WASD entering water and <br />sewer utility information and provides monthly updates to WASD management staff. Project included field data <br />collection and as-built research to collect information necessary for the input of water & sewer infrastructure. <br />North Perry Airport Park and Ride Facility, Pembroke Pines, FL - Mr. Eckardt served as Senior Project Engineer <br />for the development of a Park and Ride Facility at the North Perry Airport located on the northeast corner of <br />Pembroke Road and University Drive in the City of Pembroke Pines. The site development included the surveying <br />and design of the parking facility including a drainage and lighting system to serve riders of the Broward County <br />Transit System, and new parking lot. Mr. Eckardt was responsible for the coordination and reviews of surveying <br />services, design, permitting with the local governmental agencies and overseeing construction of this facility for <br />Broward County Transit and the City of Pembroke Pines. <br />ADA Compliant Bus Stop Improvement, Town of Miami Lakes, Miami Lakes, FL - Mr. Eckardt was the project <br />manager and engineer of record for this project, which included the filed data collection, topographic survey, scope <br />determination, and the generation of demolition, new construction, and maintenance of traffic plans. Project provided <br />the client with the design for ADA improvements to 19 bus stops locations, new bus shelters, concrete pads, <br />sidewalks and amenities and coordination with Town, Miami-Dade Transit, utility investigations & permitting. <br />Biscayne Landing Engineering and Surveying Support, North Miami, FL - Mr. Eckardt was the Project Manager <br />in this project to provide the determination of volume of crushed concrete material stockpiled at the Biscayne <br />Landings construction site and volume of lakes to be filled over an abandoned Landfill. Mr. Eckardt coordinated <br />activities between the owner, Developer and field survey crews to obtain field data of the location and elevation of <br />the stockpiled material and lake soundings. With the information of the field data, utilizing cross 25’ sections, <br />information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM), generating surfaces for <br />the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. <br />DTM was used to determine volume between the two surfaces, to generate cross sections of the stock piles at <br />constant intervals. Mr. Eckardt performed calculation reviews and signed and sealed volume reports. <br />ResumesPremiere Design Solutions, Inc.