Laserfiche WebLink
Javier Vega 14 6CEI Senior Inspector <br />Castillo Engineering, Inc. - Miami, Florida <br />Bachelor of Social Science Degree –Las Villas Central <br />University, Cuba - December 1996 <br />Building Construction Degree – Palm Beach <br />Community College – May 2010 <br />CTQP Asphalt Paving Technician – Levels I & II <br />CTQP Earthwork Construction Inspection- I & II <br />CTQP Final Estimates – Level I <br />CTQP Concrete Field Technician <br />CTQP Drilled Shaft Inspector <br />SR 817/University Drive from N. of NW 57th Street to Sunrise Lakes Blvd.; SR 816/Oakland Park Blvd. from SR University Drive to SR 5/US 1– FDOT District IV <br />This project consisted of milling and resurfacing, widening, drainage improvements, pedestrian lighting improvements, bicycle lanes, signalization, signage, pavement marking <br />and ADA improvements within the project limits. Bus shelters and signalization improvements along Oakland Park Boulevard will prioritize transit from University Drive to US-1. <br />Responsibilities include the preparation and review of monthly estimates and other documents such as: field books, site manager dailies, sample entry in MAC, asphalt reports <br />both QC and VT, drill shaft logs, as-built records, supplemental agreements and work orders. In addition, prepare and maintain accurate back up documentation for the <br />submittal of the final estimate package. <br />CEI Senior Roadway Inspector - Ft. Lauderdale, Florida CEI Services <br />SR 7 Improvement Projects from Commercial Boulevard to Broward/Palm Beach County Line – FDOT District IV. This project includes the improvements of 9.8 miles of SR 7 <br />through multiple cities in Broward County. The project scope entails milling and resurfacing, upgrading pedestrian features including 10' sidewalks on both sides and detectable <br />warning surfaces at crosswalks, installing overhead sign structures, upgrading signs and pavement markings to include a 7' bike lane in each direction, installing new bus shelters <br />with bicycle racks, trash receptacles, and benches, upgrading the drainage system, signalization system including pedestrian signals and detectors and vehicle video detection, <br />and roadway lighting. Responsibilities include the preparation and review of monthly estimates and other documents such as: field books, asphalt reports both QC and VT, drill <br />shaft logs, as-built records, supplemental agreements and work orders. In addition, prepare and maintain accurate back up documentation for the final estimate package. <br />CEI Services 2017-2019 <br />2014-2017CEI Services <br />Spanish River Blvd/Reconstruction of I-95 from North of Glades Road to Congress Avenue in Palm Beach County – FDOT District IV. This $70 million Design/Build project <br />includes constructing a new interchange at Spanish River Boulevard and I-95, widening Spanish River Boulevard west of FAU Boulevard, constructing 13 bridges between <br />Spanish River Boulevard and Yamato Road, signalized intersection improvements and the addition of auxiliary lanes on Yamato Road, and sound wall construction along Yamato <br />Road and on the east side of I-95 north of Yamato Road. Duties included preparation of daily reports and final estimates documents, material verification, sampling and testing, <br />review of maintenance of traffic and verification of quantities. <br />CEI Services 2011-2014 <br />Reconstruction and Widening of SR 70 in St Lucie County from St. Lucie /Okeechobee County Line to MP 5.871 – FDOT District IV. This $20 million project <br />consisted of constructing a new canal, wetland mitigation, drainage improvements, reconstruction and widening from a two-lane undivided road to a <br />four-lane divided highway, milling and resurfacing, new ADA ramps and sidewalk upgrades, curb and gutters, signing and pavement markings, signalization <br />upgrades. Duties included preparation of daily reports and final estimates documents, material verification, sampling and testing, review of maintenance of <br />traffic and verification of quantities. <br />FDOT Advanced MOT <br />FDOT Critical Structures Construction Issues <br />FDOT Auger Cast Pile Inspection <br />FDOT MSE Wall Inspection <br />ACI Concrete Field Technician – Level I <br />Nuclear Gauge Safety <br />NPDES Stormwater Management Inspection <br />IMSA Traffic Signal Inspector Level I <br />CEI Senior Roadway Inspector - Parkland, Florida <br />CEI Senior Roadway Inspector - Palm Beach, Florida <br />CEI Roadway Inspector - St. Luice, Florida <br />CEI Services 2012-2013 <br />(Done concurrently with 19d.) Milling and Resurfacing of SR 5 / A1A in St Lucie County from Round Island Park to E Causeway Boulevard (17th Street) – <br />FDOT District IV. This $8 million project consisted of milling and resurfacing of 8 miles of A1A, signing and pavement marking. Responsible for preparation <br />of daily construction reports and preparation of final estimates documents, review of maintenance of traffic, material sampling and testing, verification of <br />milling and paving thicknesses and quantities, performing cross-slope and rolling straightedge verification. <br />CEI Roadway Inspector - St. Luice, Florida