Laserfiche WebLink
Mario Aguila, E.I.4 3CEI Senior Inspector <br />Castillo Engineering, Inc. - Miami, Florida <br />Bachelor of Science Degree in Civil Engineering - <br />Florida International University - May 2017 <br />Engineering Intern License No. 1100023194 <br />CTQP Asphalt Paving Technician – Level I & II <br />CTQP Earthwork Inspection – Level I & II <br />CTQP Final Estimates – Level I <br />CTQP Concrete Field Technician <br />CTQP Drilled Shaft <br />I-95 Express Phase 3A-1 from South of Broward Blvd to North of Commercial Blvd – FDOT District IV. This $149 million Design/Build project includes construction of 6.7 miles of <br />I-95 to extend the existing express lanes north from just south of Broward Blvd to just north of Commercial Blvd in Broward County. One lane will be added and the High <br />Occupancy Vehicle (HOV) lane will be converted to create two express lanes in each direction. Other work includes installing Intelligent Transportation System (ITS) and tolling <br />equipment; widening bridges; MSE walls; and installing noise barrier walls at locations along I-95 Southbound between Broward Blvd and NW 6th St, and along I-95 Northbound <br />between Powerline Rd and Commercial Boulevard. Responsibility included performing inspections of all construction activities, material sampling and testing, maintenance of <br />traffic review, prepare daily reports and document roadway activities, assist other Sr. Inspectors with reporting quantities for monthly estimates. Estimated completion winter 2020. <br />CEI Senior Roadway/ Roadway Inspector - Ft. Lauderdale, Florida CEI Services <br />Reconstruction of SR 826/Palmetto Expressway Express Lanes Project in Miami-Dade County – FDOT District VI. This $248 million, 720-day Design/Build project consists of the <br />implementation of tolled express lanes along approximately ten (10) miles of the Palmetto Expressway from West Flagler Street to NW 154th Street, and approximately three (3) <br />miles of I-75 from the Palmetto Expressway to NW 170th Street. Scope components include milling & resurfacing, widening, earthwork, drainage improvements, ITS, signing & <br />pavement marking, and lighting. The work includes constructing a new flyover connecting the SR 826/Palmetto Expressway and I-75 express lanes; constructing access points <br />to/from the express lanes system; installing ramp metering at all entrance ramps along the Palmetto Expressway; installing noise barrier walls; and installing new lighting along <br />the I-75 express lanes. The work also includes construction of MSE walls, toll gantries & equipment buildings, and sound wall; as well as multiple bridge widenings. <br />CEI Services 2017-2019 <br />Quality Control Supervisor - Miami, Florida 2016-2017Quality Control <br />Responsible for ensuring that our company had all permits necessary to commence and conduct work; supervising the installation of utility infrastructure, including cable boxes for <br />AT&T and Comcast; overseeing at least three groups of workers (3 to 5 workers per group); dealing directly with homeowners, notifying them a week in advance that our <br />company would be working on and excavating in their easements and front yards in order to install cable infrastructure and boxes; and assuring that at completion of all work, <br />easements and front yards were left in a satisfactory fashion.. Duties included reviewing blueprints and mapping to ensure safe installation of cable boxes; resolving any <br />complaints that arose during and after completion of the company’s work; and conducting follow-up meetings with companies to insure accurate and on-time payment <br />FDOT Advanced MOT <br />FDOT Critical Structures Construction Issues <br />FDOT Auger Cast Pile Inspection <br />FDOT MSE Wall Inspection <br />Nuclear Gauge Safety <br />ACI Concrete Field Technician – Level I <br />NPDES Stormwater Management Inspection <br />IMSA Traffic Signal Inspector - Level I <br />CEI Roadway Inspector - Miami, Florida