Laserfiche WebLink
Juan Pablo Bisono 13 1CEI Senior Inspector <br />Castillo Engineering, Inc. - Miami, Florida <br />High School Diploma – Rio Piedras City College <br />(Puerto Rico) – June 1989 <br />CTQP Asphalt Paving Level I & II <br />CTQP Earthwork Level I & II <br />CTQP FDOT Concrete Field Technician Level I & II <br />FDOT Intermediate MOT <br />Troxler Nuclear Gauge Safety <br />SR 5/US-1 from SW 37th Ave to Ponce de Leon to Riviera Drive – District VI. This project consisted of upgrading the signalization system throughout the project corridor, <br />drainage improvements, reconstruction/widening, milling and resurfacing, signing, and lighting upgrades. Responsibilities include handling and coordinating all construction <br />activities with the contractors and utility companies, inspection and documentation of daily activities (asphalt, earthwork, drainage, concrete, drilled shafts, signalization, <br />complete lighting inspections), ensuring underground and roadway construction is completed in accordance with the specifications, reviewing testing results and earthwork <br />records, ensuring compliance with approved MOT plans and ADA, updating and tracking materials for final material certification, verifying quantities, assisting in the preparation <br />of as-built plans, public communication and coordination with businesses and residents. <br />CEI Senior Roadway Inspector - Miami, Florida CEI Services 2019-2020 <br />SR 5/Biscayne Blvd from SE 3 Ave to North of SE 2 St & SE 2 Ave from SE 2 st to SE 4 St – District VI. This project consisted of drainage improvement along Biscayne Blvd in <br />downtown Miami, milling & resurfacing along SR 5 SE 2 Ave from SE 2 St to SE 4 St, flexible pavement reconstruction, rigid pavement construction, new mast arm installation at <br />SE 2nd St and SE 2nd Ave, construction of new light poles, and ADA improvements within the project limits. Responsibilities include handling and coordinating all construction <br />activities with the contractors and utility companies, inspection and documentation of daily activities, ensuring underground and roadway construction is completed in accordance <br />with the specifications, reviewing testing results and earthwork records, ensuring compliance with approved MOT plans and ADA, updating and tracking materials for final material <br />certification, verifying quantities, preparing as-built plans and final estimate documents, public communication and coordination with businesses and residents <br />CEI Services 2018-2019 <br />Quality Control Representative - Miami, Florida 2017-2018Quality Control <br />S.R. 842 Broward Blvd Bridge Over North Fork River Replacement – District IV. This $16.2 million project consists of the total replacement of an existing bridge with installation of <br />a temporary bridge, commonly known as an “Acrow” Bridge. This project is located in the Broward County's Business Hub and Center of Mobility, and is adjacent to numerous <br />businesses, a federal building and residential condos. This project also includes milling and resurfacing, drainage improvements, signalization upgrades, ITS, lighting, signing, <br />sidewalk, and a Joint Project Agreement (JPA) for the relocation of the City of Ft. Lauderdale's existing water main. Responsibilities included performing testing and sampling <br />concrete mixes, backfill materials, oversee drilled shaft operations, asphalt reports, record density tests and enforcing over all the standards specifications. <br />Critical Structures Certification <br />10-Hour OSHA Training <br />ACI Concrete Field Testing Technician Grade I <br />ACI Concrete Transportation Construction Inspector <br />CEI Senior Roadway Inspector - Miami, Florida <br />Quality Control Representative - Miami, Florida 2012-2017Quality Control <br />NW 36th Street / SR 948 Bascule over C-6 Canal – District VI. This project consisted of a Design-Build Bridge replacement project over the C- 6 canal, <br />milling and resurfacing, intersection improvements, new mast arm installations, updating lighting, and updating ADA features within the project limits. <br />Responsibilities included testing and sampling of concrete and earthwork materials, asphalt reports, record density tests and enforcing over all the <br />standards specifications and special provisions. <br />Quality Control Representative - Miami Beach, Florida 2007-2009Quality Control <br />Miami Beach South Pointe Park- This $25 million project consisted of the renovation of a 19-acre park, including extensive site work, underground utilities, construction of new <br />walk along the coastline, parking lot renovation and addition, construction of a new Pavilion, Playground and other Accessory Buildings. The scope of work also included the <br />construction of a High Serpentine Land form, water features, and improvements to Smith Wollensky Restaurant Patio Entrance. Additionally, this project is located in an <br />environmentally sensitive area, which includes dealing with endangered species and delicate environments like Native Dunes. Extensive Pruning, Replanting and new <br />Landscaping; Irrigation Construction are also a main component of this job.