Tania Gimenez 5 3CEI Inspector
<br />Castillo Engineering, Inc. - Miami, Florida
<br />Bachelor’s Degree in Civil Engineering - Jose Antonio
<br />Echeverria Higher Polytechnic Engineering Institute, Cuba
<br />CTQP Final Estimates – Level I
<br />CTQP Earthwork Construction Inspection – Level I & 2
<br />CTQP Concrete Field Technician – Level I
<br />CTQP Asphalt Paving Technician– Level I
<br />FDOT Intermediate MOT
<br />This project scope entails constructing a pedestrian safety barrier along the existing median, constructing a ten-foot shared-use path along SR 7, minor
<br />road widening, milling and resurfacing, upgrading crosswalks, installing landscaping and irrigation in the median, and installing crosswalk curb ramps.
<br />Responsibilities include preparation of daily reports in Site Manager, maintain accurate back up documentation for the submittal of quantities, assist with
<br />the preparation of final estimate package, daily MOT reviews, asphalt and concrete reports, density testing, drilled shaft testing and reports, updating of
<br />as-built records.
<br />CEI Roadway Inspector - Ft. Lauderdale, Florida CEI Services
<br />SR 953/LeJeune Road Safety Improvement Project from SW 2nd Street to NW 11th Street in the City of Miami – FDOT District VI. This project scope entails intersection
<br />improvements at Flagler Street, NW 3rd Street and NW 7th Street including minor road widening, milling and resurfacing, new pavement markings, drainage improvements, new
<br />signalization, new lighting system, detectable warning surfaces at crosswalks, extensive sidewalk and ADA ramp replacement, curb and gutter replacement, traffic separators,
<br />adjusting utility tops along roadway and sidewalks. Responsibilities include preparation of daily reports in Site Manager, maintain accurate back up documentation for the
<br />submittal of quantities, assist with the preparation of final estimate package, daily MOT reviews, asphalt and concrete reports, density testing, drilled shaft testing and reports,
<br />updating of as-built records.
<br />CEI Services 2018-2019
<br />2017-2018CEI Services
<br />SR 90/SW 7th Street Safety Improvement Project from SW 25th Avenue to Brickell Avenue in the City of Miami – FDOT District VI. This project scope entailed milling and
<br />resurfacing, new pavement markings at various locations along SW 7th Street, upgrading pedestrian features including pedestrian countdown signals, detectable warning
<br />surfaces at crosswalks, extensive sidewalk and ADA ramp replacement, curb replacement, adjusting utility tops along roadway and sidewalks. Responsibilities included
<br />preparation of daily reports in Site Manager, maintain accurate back up documentation for the submittal of quantities, assist with the preparation of final estimate package, daily
<br />MOT reviews, asphalt and concrete reports, updating of as-built records.
<br />FDOT Critical Structures Construction Issues
<br />FDOT MSE Wall Inspection
<br />ACI Concrete Field Testing Technician – Grade I
<br />Nuclear Gauge Safety Certification
<br />2019-2020
<br />CEI Roadway Inspector - Miami, Florida
<br />CEI Roadway Inspector - Miami, Florida
<br />2017CEI Services
<br />Hurricane Irma Pre-Event Natural Disaster Monitoring/Construction Engineering & Inspection in Miami Dade County - FDOT District VI. Responsible for inspecting and
<br />documenting debris removal, repair and replacement of signs, roadway lighting, signalization and erosion control, cleaning of drainage system throughout numerous areas in
<br />Miami Dade County. Preparing daily work reports, tracking quantities as well as time and material records, reviewing invoice requisitions from the Contractors.
<br />CEI Roadway Inspector - Miami, Florida
<br />2015-2017CEI Services
<br />This $26.4 million project included the reconstruction 5 miles of a new 4-lane divided section with a 40-foot median and guardrail in select locations. Environmental awareness is
<br />addressed with the installations of 6’ x 22” wildlife crossings and a water-quality sensitive drainage system with more than 8,400 LF of French drain, almost 9,400 LF of solid pipe,
<br />and 190 drainage structures. The Project also addressed multi-modal and safety purposes by providing 5-foot paved shoulders for the north- and southbound roadways that will
<br />be marked for bicycle use. The Project is adjacent to the Florida Everglades and required significant de-mucking for the construction of the widened section. Duties included
<br />preparation of daily reports and final estimates documents, material verification, sampling and testing, verification of quantities and document control.
<br />CEI Roadway Inspector Aide - Miami, Florida
|