SR 997/Krome Ave from SW 312 St to SW 296th St and from SW 296 St to S of 232nd St – FDOT District VI. This $35.5 million project consists of adding lanes and pavement
<br />rehabilitation along SR 997/Krome Ave from SW 312 Street/Campbell Drive to SW 296 St. As well as the reconstruction and addition of lanes from SW 296 Street to S of SW
<br />232 St. Additional improvements include the reconstruction of 5 existing signalized intersections, a new signalized intersection, the construction of two new bridges over C-103
<br />Canal, and the construction of new access roads for SFWMD. Responsibilities included supervising inspection staff in the application of Department Procedures and
<br />Standards, monitoring field testing and results, preparing Supplemental Agreements and Work Orders required for implementing contract changes, working with the Engineer
<br />of Record to coordinate design changes and plan revisions, reviewing and analyzing construction claims to determine entitlement. Estimated completion Spring 2021.
<br />Ernesto Bravo 9 4CEI Inspector
<br />Castillo Engineering, Inc. - Miami, Florida
<br />High School Degree – Miguel D. Perez High School –
<br />Sagua la Grande, Cuba - 1986
<br />CTQP Earthwork Construction Inspection – Levels I & II
<br />CTQP Asphalt Paving Inspection - Levels I & II
<br />CTQP Final Estimates - Level I
<br />CTQP Concrete Field Inspector Specification
<br />CTQP Pile Driving Inspection
<br />CEI Roadway Inspector - Miami, Florida CEI Services
<br />CEI Services 2019
<br />2016-2019CEI Services
<br />Reconstruction of SR-7/US-441 from Fillmore St to South of Stirling Rd - FDOT District IV. This $29.6 million project along 2.08 miles of SR-7 in Broward County includes adding
<br />one through lane in each direction for a total of 6 lanes with left turn lanes separated by raised medians, constructing new storm sewer system and retention ponds, installing new
<br />water and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing sidewalks with ADA compliant ramps on both sides
<br />of the road, upgrading existing signalized intersections with mast arms and add pedestrian countdown timers, installing new signalized intersection and install new lighting, adding
<br />Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway. Duties include roadway inspections,
<br />verification of earthwork operations, concrete sampling and testing, conduct maintenance of traffic reviews, preparation of daily reports and document roadway activities.
<br />CEI Roadway Inspector - Miami Beach, Florida
<br />CTQP Drilled Shaft Inspection
<br />FDOT Critical Structures Construction Issues
<br />FDOT MSE Wall Inspection
<br />FDOT Intermediate MOT
<br />ACI Concrete Field-Testing Technician - Level I & II
<br />Troxler Nuclear Gauge Safety
<br />Reconstruction and Safety Improvements along SR 907/Alton Road at Michigan Avenue in the City of Miami Beach – FDOT District VI. This $1.5 million project consists of
<br />widening the roadway to accommodate a second southbound left-turn lane at the intersection of Alton Rd and Michigan Ave, installing drainage inlets at various locations,
<br />removing and relocating landscaping as needed, milling and resurfacing, repaving and restriping the roadway, upgrading pedestrian curb ramps to meet ADA requirements,
<br />construction of new sidewalks, installing new traffic and pedestrian signals and signs, installing new street lighting. Responsibilities include handling and coordinating all
<br />construction activities with the contractors and utility companies, inspection and documentation of daily activities, ensuring underground and roadway construction is completed in
<br />accordance with the specifications, ensuring compliance with approved MOT plans, verifying quantities, preparing as-built plans and final estimate documents.
<br />CEI Roadway Inspector - Broward, Florida
<br />2013-2016CEI ServicesCEI Roadway Inspector - Miami, Florida
<br />Widening of the Homestead Extension of Florida’s Turnpike from SW 216th Street to Killian Parkway - FDOT Florida’s Turnpike. This $190.0 million project consisted of the
<br />complete reconstruction of the Turnpike in Miami-Dade County including six (6) new bridges and twelve (12) bridge widenings, non-redundant drilled shafts, 18” and 24”
<br />prestressed concrete piles, construction of MSE walls, installation of new drainage system, jack and bores, auger cast piles, sound walls, miscellaneous drilled shafts, new
<br />signalization, upgrades at nine (9) major intersections, pier protections and concrete barrier walls, milling and resurfacing, lighting, signing and pavement markings, construction
<br />of new sidewalks. Duties included roadway and bridge inspections, verification of earthwork operations; concrete sampling and testing, conduct maintenance of traffic reviews,
<br />preparation of daily reports and document roadway activities, assist the senior inspector with reporting quantities for monthly estimates. Handled the Density Records Log Book.
<br />CEI Roadway Inspector - Ft. Lauderdale, Florida CEI Services 2011-2013
<br />I-595 Express Corridor Improvement P3 Project – FDOT District IV – This $1.3 billion project consisted of roadway inspections along the 10 miles’ corridor of I-595 installation of
<br />drainage system, construction of MSE walls, auger cast piles, sound walls, micro-tunneling, utility relocations, inspection of maintenance of traffic, drilled shafts, pile driving,
<br />asphalt paving, lighting and landscaping. His responsibilities included performing roadway inspections, quality control on earthwork operations; quality control on concrete pours
<br />by testing and sampling in compliance with FDOT Specifications. Interacted with general contractors and subcontractors; sent daily reports to the Project Owner describing
<br />quantities of material used and wasted; earthwork, density testing on embankments, subgrades and bases. Inspected finished bases, MSE walls, density testing on storm sewer
<br />pipes and structures. Handled the Density Records Log Book.
|