Laserfiche WebLink
SR 9/I-95 at SR 824/Pembroke Road Interchange <br />Improvements Project (Hallandale Beach, FL) <br />This $1.5 million project consists of widening the I-95 off ramps at Pembroke Road to accommodate <br />an additional right turn lane; shoulder widening of the I-95 on ramps at Pembroke Road; upgrading the <br />existing traffic signals at the intersections of Pembroke Road and the I-95 off ramps; upgrading the <br />existing lighting along the I-95 on and off ramps at Pembroke Road to LED lighting; reconstructing the <br />sidewalks and pedestrian crossings at the I-95 off ramps and the I-95 northbound on ramp at <br />Pembroke Road; and milling and resurfacing within the project limits. CEI responsibilities included <br />handling and coordinating all construction activities with the contractors and utility companies, <br />inspection and documentation of daily activities (asphalt, earthwork, drainage, concrete, drilled shafts, <br />signalization, complete lighting inspections), ensuring underground and roadway construction is <br />completed in accordance with the specifications and Contract documents, reviewing testing results <br />and earthwork records, ensuring compliance with approved MOT plans and ADA, updating and <br />tracking materials for final material certification, verifying quantities, preparing as-built plans and final <br />estimate documents, public communication and coordination with businesses and residents. <br />FDOT Erik Nemati, P.E. <br />6 <br />(954) 299-6441 <br />2020CEI Services