Description
9th Amnd w/KCI Technologies for professional svcs for the FPL overhead to underground conversion project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 2 sign and Parmittirg <br />Step A, 09L Tariff A#rnaaent: FP&L has a program in place for municipal underprounding <br />projects. Under the conditions of the program the CITY would enter into an agreement with FM <br />The agr"men# would require a non-refundable depaslt to FP&L for design services resulting in the <br />following; <br />* ft5°!. design with sufficient detail for permit submittal (FP&L services only). <br />A firm cost for installation (assumes turn -key project from FP&Q, <br />* An outline for credit and conditions (up to 25% credit available!), <br />180 -day window for acceptance (extensions likely but with potential for additional cost). <br />Obviously the ability of FP&L to respond will depend upon the complexity of the request, but the <br />general response tante for design projects is 16 weeks upon receipt of 10'/o design deposit, It is <br />important to note that FP&L deign will only address FIS&L seMce , flans 01 need to be coordinated <br />with Aar ulfts to further define project requirements, <br />p 5. Utility Coordination; Once complete, the F'P&L design requires c000rdhation with other <br />utl�it & Rolle -line agreements need to be severed and new Mement ardor right-of-way agreement.$ <br />prepared, Street Lightiig needs to be designed to replace the Cobra -heads removed <br />with existing <br />power poles. General eootdinatian with ekSting utilities needs to include location of traffic sW&-anon <br />boxes, pull boxes, transformers, switchgear, and wat6dsewer services. Sefte connections across <br />private properties 060 to be addressed. As a condition of the Tarifa Agreetrient, FP&L vat# obligate the <br />U Y tb see that ssrvi connections are made within the agreed upon titheframs, With the elimination <br />of csvemead poles, private serNices and transformers will be dropped. OisaussioAs new to include <br />potential ph sin ,bf Work.as reiated to aha spegific u#ifl#y; #t may be that a c oiimponaht that defines the <br />phase fr- 4s for one utility does haat coincide wfth component defining phasing for anatiier. <br />Stdo 6. I ire Cghi ftotfon Documents, Once all of the design issues and require ri$nts have <br />been idehfifid; cpn' st*rMc ion documents coordinating and addfa&g utility roncems •are prepar®d. <br />mase plans are used for circulatir r aif brig &talteholders for conflrrma'Ion of hnprovemehts and <br />strbrMlt I td appropriate ber�i�ait-agencies. Final Plans vel Coe used in bid.dements. At this stage, in <br />addition to firm e4irrr ies from &L, an estimated cost of other utility relocation will be compared <br />against the projgct budget. <br />-ti6nar dery A�re�ti <br />Piolen Flame: U(My UndolOMMO 19 consultmq <br />F PrOlecit L=fin: Sunny isles Ban - Ft: <br />ITT and - A P}-, M Pmpsal No-, P5UB,t R <br />ENGINEERS, PL4NN2R$, 44AYORSReViOd February §, 2013 Rage 3 <br />