My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3110
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 10:07:31 AM
Creation date
10/5/2020 10:04:25 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3110
Date (mm/dd/yyyy)
09/17/2020
Description
9th Amnd w/KCI Technologies for professional svcs for the FPL overhead to underground conversion project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 3 — Biddinal(:onstructi on: <br />Step P. Sidding; The agreement with FPR A result in a binding estimate as a tum•kay project for <br />FP&L improverrients only; for a 00mmplete sc,. of services, fhe CITY will laid thee Col siruction <br />Documents as submitted for permit. Upon selection of Contractor dernon t frog oedificat on from <br />FP&L, the tariff will re0tra moftation to account for the din ifthed services provided by ''L. <br />Step & Construction: The key to a successful conatfticticrnn ,prone is arirerertce to schedule <br />wkhoulcaoss tt inooreases and rnfribal disruplion to the public. Public involvement, although a neo <br />esSally <br />cornpohent throughout the pracess, will be critical during the construction phase to provide public <br />awareness and addressing ccrcernslquaslion& Dep -eliding upon the type and extant of <br />improvement, certification for compknce wilt permits may be required. if desired, CITY could elect to <br />have a full time project representative asserted vAth the projects to act as a liaison between the CITY <br />and pgblic or handle through ". Finally, upon completion, tis buts are collectiod, reviewed and <br />distr uted, parniiis and contracts are closed W, fonds and feral payments released. <br />3.0 SCOPE CF SERVICES <br />Services to be provided by CONSULTANT under this initial Work Autholzation small pertain to Project <br />AWSSmetit (PhEise j) only as (elated to approximately 2.2 roles of Collins Avenue_ In addaion to <br />Undergrounding, -gON�UL-TAW sha l fpyv sfigpte lie ongoing matftinctibn of strae%hts alqpg Collins <br />Avenin v+itta t the Intent of identify the press through which a solution can be implemented in conjunction <br />.with Undergtounding efforts. Tasks for subsequent .phases will be defined under separate work <br />ai i t ®ri; Services for this work adthorWon shall include the follo6ving. <br />P <br />TASK 1— Prepare Pre[rrriinaty Cost Estimate <br />Sur $k 13 — used upon Vickoff riWefing +;fth the CITY, CONSULTANT shall compile budgetaiy cast <br />estimates for the cornplete prgj�ct. Further, with the lel+el cif input available arum hie fcf�Alified ufif�ies, <br />CONSULTANT- win prepare a prelimkwy s�iedule 61 the project fdr use in assis#int� �$ CITY in <br />updating of.ihe bap tel mptciv rhent Flan (CIP). CLIENT understands that at.ttriis age, #h� priSj� <br />extriFmely,canceptial with miniriial input pruuided by FP&L or other U'tfies. Bridget esiiaiates are to <br />be leased uppri cdanpral assumptions validated where possible by FP&L and tltiGty providers. <br />tirnates will identity general assumPtift and qualifications. <br />Subtdsk 1.2 — Attend one Staff and one, Commission meeting to introditce the project, prcc , <br />budget, and sohadcile via PovrerPoint preeentat cih. <br />PtOf_�Smicesrv.mi�nt <br />Pr6 1 WiM., tJF4 +raga muf4to Cofflulmig <br />Pro1m L&It6: t6y tiles efi, FL <br />i evt� PWrvarY 5, 2013 `P W4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.