|
12. NAME
<br />Anthony Alfred, P.E.
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />MOT; Utilities Coordination
<br />15. FIRM NAME AND LOCATION (Cityand State)
<br />Kimley-Horn and Associates, Inc., Miami, FL
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />27 1 1
<br />16. EDUCATION (Degree and Specialization) 117. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Bachelor of Science / Civil Engineering / Florida International University FL / Professional Engineer / 51857 / 1997
<br />/1991
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Has 27 years of experience in highway, transportation, and civil engineering design projects. He provides leadership, direction, and guidance for
<br />the highway team as well as solutions to challenges encountered during the engineering analysis and design phases.
<br />19. RELEVANT PROJECTS
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />-114-
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Okeechobee Road (SR 25) from East of NW 87 Avenue to NW 79 Avenue,
<br />FDOT District Six
<br />2020
<br />2020
<br />a
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer assisting with the final design of this one -mile section of Okeechobee Road, adjacent frontage road and NW South River
<br />Drive in Miami -Dade County. Other services include widening the existing road to four lanes in each direction; widening the NW 79th
<br />Avenue Bridge and the SR826 SB Ramp Bridge over the Miami (C-6) Canal.
<br />(1) TITLE AND LOCATION (Cityand State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Florida's Turnpike Widening from Glades Road to Atlantic Avenue,
<br />Florida's Turnpike Enterprise, Palm Beach County, FL
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />b'
<br />Project engineer responsible for the widening design of the Turnpike mainline from 6 to 10 lanes, including express lanes. Design services
<br />include stabilizing the Lake Worth Drainage District (LWDD) E -2W canal bank to support the project's widening, replacing the Yamato Road
<br />bridge over the Turnpike, widening the bridge over Clint Moore Road, replacing the bridge over L-38 Canal, designing noise barriers,
<br />roadway lighting, signing and pavement markings, and utility coordination. Our team is also responsible for supporting FTE with public
<br />information and agency meetings for Palm Beach County, cities of Boca Raton and Delray Beach, Lake Worth Drainage District, and 18
<br />adjacent homeowner associations, and coordination with FGT regarding the Specified Width.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Sand Lake Road Interchange Design, Florida's Turnpike Enterprise,
<br />Orlando, FL
<br />Ongoing
<br />C.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Senior project engineer assisting with ramp design for the construction of a new interchange at Florida's Turnpike and Sand Lake Road.
<br />The project includes the reconstruction of a bridge over Florida's Turnpike and providing tolling sites for two of the four interchange ramps.
<br />Additionally, the project includes extensive coordination with Florida Gas Transmission for possible conflicts with their facilities.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />1-95 Corridor -wide Planning for Operational Deficiencies, US 1 to Broward
<br />County Line, FDOT District Six, FL
<br />2019
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />d.
<br />Project Engineer. Kimley-Horn developed and evaluated improvement concepts and performed a detailed planning level operational
<br />analysis for the 1-95 corridor within District Six. The analysis included evaluation of the study interchanges, interchange influence areas, and
<br />ramp junctions, as well as post -implementation operational conditions of the 95 Express corridor improvements. The purpose of this
<br />evaluation was to identify deficiencies focusing on recurring bottlenecks and to develop a series of proposed improvements to address the
<br />existing and future demands of the corridor.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />SR 826 Connector at Golden Glades Interchange and Various Ramps,
<br />FDOT District Six, Miami, FL
<br />2019
<br />e
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer providing temporary traffic control plans for the firm's services as a subconsultant to another firm. The Golden Glades
<br />Interchange (GGI) provides connectivity to six major arterials and limited access expressway facilities in Miami -Dade County including 1-95,
<br />SR 826/Palmetto Expressway, Florida's Turnpike, SR 7/US 441, and NW 167th Street.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />-114-
<br />
|