Laserfiche WebLink
12. NAME <br />Anthony Alfred, P.E. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />MOT; Utilities Coordination <br />15. FIRM NAME AND LOCATION (Cityand State) <br />Kimley-Horn and Associates, Inc., Miami, FL <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />27 1 1 <br />16. EDUCATION (Degree and Specialization) 117. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor of Science / Civil Engineering / Florida International University FL / Professional Engineer / 51857 / 1997 <br />/1991 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Has 27 years of experience in highway, transportation, and civil engineering design projects. He provides leadership, direction, and guidance for <br />the highway team as well as solutions to challenges encountered during the engineering analysis and design phases. <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />-114- <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Okeechobee Road (SR 25) from East of NW 87 Avenue to NW 79 Avenue, <br />FDOT District Six <br />2020 <br />2020 <br />a <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project engineer assisting with the final design of this one -mile section of Okeechobee Road, adjacent frontage road and NW South River <br />Drive in Miami -Dade County. Other services include widening the existing road to four lanes in each direction; widening the NW 79th <br />Avenue Bridge and the SR826 SB Ramp Bridge over the Miami (C-6) Canal. <br />(1) TITLE AND LOCATION (Cityand State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Florida's Turnpike Widening from Glades Road to Atlantic Avenue, <br />Florida's Turnpike Enterprise, Palm Beach County, FL <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />b' <br />Project engineer responsible for the widening design of the Turnpike mainline from 6 to 10 lanes, including express lanes. Design services <br />include stabilizing the Lake Worth Drainage District (LWDD) E -2W canal bank to support the project's widening, replacing the Yamato Road <br />bridge over the Turnpike, widening the bridge over Clint Moore Road, replacing the bridge over L-38 Canal, designing noise barriers, <br />roadway lighting, signing and pavement markings, and utility coordination. Our team is also responsible for supporting FTE with public <br />information and agency meetings for Palm Beach County, cities of Boca Raton and Delray Beach, Lake Worth Drainage District, and 18 <br />adjacent homeowner associations, and coordination with FGT regarding the Specified Width. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Sand Lake Road Interchange Design, Florida's Turnpike Enterprise, <br />Orlando, FL <br />Ongoing <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Senior project engineer assisting with ramp design for the construction of a new interchange at Florida's Turnpike and Sand Lake Road. <br />The project includes the reconstruction of a bridge over Florida's Turnpike and providing tolling sites for two of the four interchange ramps. <br />Additionally, the project includes extensive coordination with Florida Gas Transmission for possible conflicts with their facilities. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />1-95 Corridor -wide Planning for Operational Deficiencies, US 1 to Broward <br />County Line, FDOT District Six, FL <br />2019 <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />d. <br />Project Engineer. Kimley-Horn developed and evaluated improvement concepts and performed a detailed planning level operational <br />analysis for the 1-95 corridor within District Six. The analysis included evaluation of the study interchanges, interchange influence areas, and <br />ramp junctions, as well as post -implementation operational conditions of the 95 Express corridor improvements. The purpose of this <br />evaluation was to identify deficiencies focusing on recurring bottlenecks and to develop a series of proposed improvements to address the <br />existing and future demands of the corridor. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />SR 826 Connector at Golden Glades Interchange and Various Ramps, <br />FDOT District Six, Miami, FL <br />2019 <br />e <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project engineer providing temporary traffic control plans for the firm's services as a subconsultant to another firm. The Golden Glades <br />Interchange (GGI) provides connectivity to six major arterials and limited access expressway facilities in Miami -Dade County including 1-95, <br />SR 826/Palmetto Expressway, Florida's Turnpike, SR 7/US 441, and NW 167th Street. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />-114- <br />