Juan Jimenez, P.E.
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />General Civil Engineering
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Kimley-Horn and Associates, Inc., Miami, FL
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />26 1 20
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Bachelor of Science / Civil Engineering / Florida International University / FL / Professional Engineer / 56704 / 2001
<br />1993
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Has 26 years of municipal and utility engineering consulting experience. His experience includes projects involving water supply and distribution,
<br />wastewater collection and transmission, stormwater management, roadway, general civil engineering and land development.
<br />19. RELEVANT PROJECTS
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />-116-
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Brickell City Centre, City of Miami, FL
<br />2009
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />a•
<br />Served as senior civil engineer for this $1.05 billion mixed-use urban development. Strategically located in the center of Miami's Brickell
<br />financial district, the project was one of the largest urban redevelopments in downtown Miami. It consisted of 9.1 acres along both sides of
<br />South Miami Avenue between SE 8th Street and SE 6th Street and included an aggressive construction schedule, impacts to three different
<br />roadway jurisdictions, large potable water demands, overhead pedestrian bridges across city rights-of-way, and non-standard placement of
<br />utility features within Miami -Dade Transit right-of-way.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />SR 7101Beeline Highway Design (East and West), FDOT District Four,
<br />Riviera Beach, FL
<br />2007
<br />2009
<br />b.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer. The combined length of both projects is 5.33 miles. The western project consists of the addition of two new lanes to provide a
<br />four -lane divided rural roadway, along with the replacement of the existing two-lane bridge and the construction of a new two-lane parallel
<br />bridge. The eastern project consists of the new construction to provide a four -lane divided urban roadway.
<br />(1) TITLE AND LOCATION (City and State)-
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicab/e)
<br />The Underline Master Plan, Miami -Dade County, FL
<br />2016
<br />I
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />c.
<br />Project Engineer. Kimley-Horn led the transportation planning and civil engineering support aspects of The Underline Master Plan. The
<br />Underline is an iconic bicycle and pedestrian greenway and urban linear park under the Miami -Dade Metrorail corridor. Our services included
<br />site analysis, mobility recommendations, transportation safety recommendations, framework plan support, key agency review meetings, and
<br />public meeting support. Improvements included wide path crossings with separate space for bicyclists and pedestrians, pavement markings,
<br />colored pavement treatments, and bicycle traffic signals.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Miami Beach 72 -Inch Drainage Pipe (Washington Avenue and 17th
<br />Street), Miami Beach, FL
<br />2018
<br />I
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />d.
<br />Project Engineer. As part of the City's on-call general services contract, Kimley-Horn was retained by the City of Miami Beach to provide design
<br />services for a proposed 72 -inch diameter Washington Avenue and 17th Street. Kimley-Horn's scope included the design the extension of a 72 -
<br />inch storm drainage pipe to the existing 96 -inch storm pipe along Washington Avenue southerly to 17th Street then turning westerly along 17th
<br />Street to terminate at an existing culvert located on Meridian Court. The scope also included the identification of existing utility conflicts, design
<br />of conflict structures and interconnection of other minor existing system to the proposed 72 -inch.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />Washington Avenue Roadway Improvements, Phase ll, Homestead, FL
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />e.
<br />Project Engineer. Kimley-Hom was selected for the new construction and widening of Washington Avenue from NE 2nd Street to NE 8th Street
<br />from a two-lane undivided section to a two-lane divided urban section with parking on both sides. The project included roadway, drainage,
<br />signing and marking, lighting, water main extension, landscaping, and irrigation plans. The project included obtaining all required permits,
<br />preparation of bid documents, and construction supervision.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />-116-