Laserfiche WebLink
Juan Jimenez, P.E. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />General Civil Engineering <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., Miami, FL <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />26 1 20 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor of Science / Civil Engineering / Florida International University / FL / Professional Engineer / 56704 / 2001 <br />1993 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Has 26 years of municipal and utility engineering consulting experience. His experience includes projects involving water supply and distribution, <br />wastewater collection and transmission, stormwater management, roadway, general civil engineering and land development. <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />-116- <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Brickell City Centre, City of Miami, FL <br />2009 <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />a• <br />Served as senior civil engineer for this $1.05 billion mixed-use urban development. Strategically located in the center of Miami's Brickell <br />financial district, the project was one of the largest urban redevelopments in downtown Miami. It consisted of 9.1 acres along both sides of <br />South Miami Avenue between SE 8th Street and SE 6th Street and included an aggressive construction schedule, impacts to three different <br />roadway jurisdictions, large potable water demands, overhead pedestrian bridges across city rights-of-way, and non-standard placement of <br />utility features within Miami -Dade Transit right-of-way. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />SR 7101Beeline Highway Design (East and West), FDOT District Four, <br />Riviera Beach, FL <br />2007 <br />2009 <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project engineer. The combined length of both projects is 5.33 miles. The western project consists of the addition of two new lanes to provide a <br />four -lane divided rural roadway, along with the replacement of the existing two-lane bridge and the construction of a new two-lane parallel <br />bridge. The eastern project consists of the new construction to provide a four -lane divided urban roadway. <br />(1) TITLE AND LOCATION (City and State)- <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicab/e) <br />The Underline Master Plan, Miami -Dade County, FL <br />2016 <br />I <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />c. <br />Project Engineer. Kimley-Horn led the transportation planning and civil engineering support aspects of The Underline Master Plan. The <br />Underline is an iconic bicycle and pedestrian greenway and urban linear park under the Miami -Dade Metrorail corridor. Our services included <br />site analysis, mobility recommendations, transportation safety recommendations, framework plan support, key agency review meetings, and <br />public meeting support. Improvements included wide path crossings with separate space for bicyclists and pedestrians, pavement markings, <br />colored pavement treatments, and bicycle traffic signals. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Miami Beach 72 -Inch Drainage Pipe (Washington Avenue and 17th <br />Street), Miami Beach, FL <br />2018 <br />I <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />d. <br />Project Engineer. As part of the City's on-call general services contract, Kimley-Horn was retained by the City of Miami Beach to provide design <br />services for a proposed 72 -inch diameter Washington Avenue and 17th Street. Kimley-Horn's scope included the design the extension of a 72 - <br />inch storm drainage pipe to the existing 96 -inch storm pipe along Washington Avenue southerly to 17th Street then turning westerly along 17th <br />Street to terminate at an existing culvert located on Meridian Court. The scope also included the identification of existing utility conflicts, design <br />of conflict structures and interconnection of other minor existing system to the proposed 72 -inch. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />Washington Avenue Roadway Improvements, Phase ll, Homestead, FL <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />e. <br />Project Engineer. Kimley-Hom was selected for the new construction and widening of Washington Avenue from NE 2nd Street to NE 8th Street <br />from a two-lane undivided section to a two-lane divided urban section with parking on both sides. The project included roadway, drainage, <br />signing and marking, lighting, water main extension, landscaping, and irrigation plans. The project included obtaining all required permits, <br />preparation of bid documents, and construction supervision. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />-116- <br />