Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT <br />Juan Fuentes, P.E., S.E., LEED AP Elevator Shaft, Stairs <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., Miami, FL <br />14. YEARS EXPERIENCE <br />a. TOTAL I b. WITH CURRENT FIRM <br />21 2 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor of Science / Civil Engineering / University of Miami / 1999 FL / Professional Engineer / 62426 / 2004 <br />Bachelor of Science / Civil Engineering / University of Miami / 1999 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Juan has more than 21 years of structural engineering experience. During this time, he has been involved in all aspects of a project from design <br />concept through construction administration. He has worked on a variety of project types including residential, educational, healthcare, institutional, <br />municipal, and sports facilities. Florida Structural Engineers Association, member and past president; American Society of Civil Engineers (ASCE), <br />member; Urban Land Institute, member <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />Florida Marlins Ballpark, Miami, Florida <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />2006 I <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />a. <br />Lead project engineer through 30% IGMP drawings for the new 38,000 -seat baseball stadium. Responsible for detailing and construction <br />documents under the supervision of the Principal -in -charge. Supervised staff engineers and verified the analysis and design of gravity and <br />lateral elements. Project included a signature elevator tower with cantilever lobbies (not built) and switchback cantilever stairs throughout. <br />(1) TITLE AND LOCATION (Cityand State) <br />2 YEAR COMPLETED <br />Valente Brothers Jiu-Jitsu, North Miami Beach, Florida <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />2016 <br />I <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />b. <br />Project Manager and engineer of record for a new 24,000 square foot (sf) retail building. Project utilized precast prestressed concrete roof and <br />floor joist, interior concrete columns, infill reinforced masonry walls, and deep foundations. The project highlighted an interior elevator with wrap- <br />around cantilever stair. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Pines City Center- Phase IB, Pembroke Pines, Florida <br />2019 <br />I On going <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager and Engineer of Record for a new 40,000 square foot (so two story retail building. Project utilized open web joist roof framing, <br />interior steel columns, composite steel floor framing system, infill reinforced masonry walls, and shallow foundations. The building highlighted a <br />interior elevator with wrap-around cantilever stair. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Baptist Hospital West Kendall, Miami, Florida <br />2004 <br />I 2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />d. <br />Project manager and Engineer of Record (Foundation Permit) for a new LEED Certified $100 Million 4 -story, 318,000 square foot hospital, <br />medical office building and central energy plant. The project used a combination of concrete moment frames and shear walls to resist wind <br />forces, prestressed joist for the floor framing, and six-inch precast concrete panels for cladding. The structure is designed to resist the lower <br />bound wind speed of a Category 5 hurricane. The project highlighted a spiral staircase at the main lobby. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />Single Family Residences, South Florida <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />2013 <br />I 2015 <br />e. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Project Engineer and Field Representative for numerous single story and multi -story single family residences throughout South Florida. Most <br />structures utilized prefabricated wood trusses, load bearing masonry, and shallow foundations. Projects highlighted slab -less stairs. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />