|
12. NAME
<br />Maggie Giraldo, P.E.
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Environmental Engineering and Stormwater
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Kimley-Horn and Associates, Inc., Miami, FL
<br />14. YEARS EXPERIENCE
<br />a. TOTAL I b. WITH CURRENT FIRM
<br />6 6
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Bachelor of Science / Environmental Engineering / University of Miami / FL / Professional Engineer / 87428 / 2019
<br />2014 FL /Engineering Intern / 1100019137 / 2015
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Has six years of experience as a project analyst. She has provided her water resources knowledge to stormwater management design projects,
<br />participated in on-site inspections, provided water sample calculations, and assisted in laboratory analyses to determine contamination levels.
<br />19. RELEVANT PROJECTS
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />-119-
<br />(1) TITLE AND LOCATION (Cityand State)
<br />2 YEAR COMPLETED
<br />PBA/Fern Isle Redevelopment Project, Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />2017 I
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />a.
<br />Project Analyst. Kimley-Hom provided landscape architecture and civil engineering services from concept through construction administration
<br />for the PBA/Fern Isle Redevelopment Project. PBA/Fern Isle Park is a proposed 6 -acre riverfront passive park with amenities such as multi -use
<br />lawn area, play landforms, large picnic shelters, outdoor exercise area, walking paths, parking/drop-off area, historic pedestrian bridge with
<br />hanging chairs, waterfront promenade, and wayfinding and historic signage.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />Lakeview District Utility Crossings, Medley, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />2016
<br />2017
<br />b
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Analyst. Kimley-Horn provided professional engineering services for the design of several pipeline segments to serve future
<br />development over approximately 600 acres of currently vacant land. The crossings were designed such that they are constructed ahead of the
<br />proposed roadway and drainage facilities along 87th Avenue in the Town of Medley.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />Flood Mitigation Area South Roadway and Drainage Improvements,
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Medley, FL
<br />2016
<br />I 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />C.
<br />Project Analyst. Kimley-Horn provided professional engineering services for roadway and drainage improvements for over 4,000 linear feet of
<br />roadway within the Flood Mitigation Area in the Town of Medley. As one of the largest public infrastructure undertakings in the Town's history,
<br />this project is expected to alleviate flooding in the area and increase roadway capacity in the area.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />Lift Station 100A Upgrade, Medley, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />2015
<br />I 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />d.
<br />Project Analyst. Kimley-Horn provided professional engineering services for the design of a new lift station, which will replace an aging privately -
<br />constructed station which was donated to the Town. The station and associated controls are designed to integrate into the Town's Supervisory
<br />Control and Data Acquisition (SCADA) system. Services provided in support of the project include design, bid assistance, and construction
<br />phase assistance.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />Geographic Information Systems (GIS) Sewer Collection and
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Transmission System Atlas, Medley, FL
<br />2019
<br />I
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />e.
<br />Project Analyst. Kimley-Horn provided professional engineering services for the development of a GIS sewer atlas for the Town. Miami -Dade
<br />County Water and Sewer Department entered into a consent decree with the Environmental Protection Agency. As part of this consent decree,
<br />all large volume customers of the department, of which the Town in one, must provide the department with a GIS atlas of their sewer facilities
<br />which can interface with the department's existing GIS atlas.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />-119-
<br />
|