Laserfiche WebLink
12. NAME <br />Jerry M. Piccolo, P.E. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />13. ROLE IN THIS CONTRACT <br />Structural Engineer <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., West Palm Beach, FL <br />YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />6 1 6 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Master of Engineering / Civil Engineering / University of Florida / 2012 FL / Professional Engineer / 80484 / 2016 <br />Bachelor of Science / Civil Engineering / University of Florida / 2011 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Six years of experience providing structural design support for roadway improvements in South Florida. Experience includes bridge design, mast - <br />arm design, overhead sign structures, retaining walls, noise walls, toll gantries, and construction phase services. <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 812016) PAGE 2 <br />12o- <br />(1) TITLE AND LOCATION (City and State)2 <br />YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Lowson Boulevard Pedestrian Bridges, Delray Beach <br />2020 <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />a. <br />Project manager. Kimley-Horn was retained by City of Delray Beach to complete a set of construction plans for two pedestrian bridges for the <br />proposed pedestrian improvements along Lowson Blvd. The bridges will be on either side of Lowson Blvd and provide pedestrian connectivity <br />over Lake Worth Drainage District's (LWDD) E-4 Canal . These bridges are part of the bicycle lane addition for Lowson Blvd. The project also <br />includes permitting and coordination with LWDD and the US. Army Corps of Engineers. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Atlantic Boulevard Bascule Bridge Improvements including Decorative <br />Sails and Lighting, Pompano Beach <br />2019 <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />b' <br />Structural engineer. Kimley-Hom designed safety and aesthetic improvements to this 400 -foot bascule bridge over the Intracoastal Waterway. <br />Kimley-Horn designed a replacement traffic railing and an under -bridge walkway to improve pedestrian access to the water. The project <br />involved the design and construction of enhancements to the bridge facade, tender house, traffic railings, lighting, large tensioned sails at each <br />end of the bridge (four total) and computerized uplighting, artwork on bridge facades, land-based lighting, and a pedestrian esplanade under the <br />bridge connecting restaurants and buildings from the south to the north. The design -build team was responsible for complete design, permitting, <br />and coordination with FDOT. Kimley-Horn obtained all permits for the project through coordination with FDOT, USACE, USCG, FDEP, the City, <br />and SFWMD. The project created a signature gateway within the City's Beach district. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Lyons Road Bridge from Clint Moore Road to Atlantic Avenue, Palm <br />Beach County <br />2018 <br />2018 <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Structural engineer for a new Lyons Road bridge over the Lake Worth Drainage District (LWDD) L-38 Canal adjacent to the existing bridge. <br />Careful attention needs to be maintained when working adjacent to existing large underground utilities and overhead electric lines that may <br />interfere with bridge pile driving. Coordinated closely with LWDD for the design of the new bridge and consideration of canal access. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />SR 992/SW 152nd St. (Coral Reef Drive) from SR 821 (HEFT) NB Ramp to <br />SR 51US•1, FDOT District Six <br />2018 <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />d. <br />Structural engineer for the rehabilitation and retrofit of an existing 3 -span, PC/PS concrete slab unit bridge crossing the C-100 Canal. The <br />existing bridge utilized non -composite slab units placed side-by-side with an asphalt topping. Over the years, through milling and resurfacing <br />operations, the asphalt thickness had increased 2-3 times the original maximum design thickness in several locations. Expansion joints were <br />replaced at all supports, concrete traffic railings were reconstructed to the latest FDOT Standards, and new ADA compliant sidewalks with <br />aluminum pedestrian railings were reconstructed along each side of the bridge. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Okeechobee Road (SR 25) from East of NW 87 Ave to NW 79 Ave, FDOT <br />District Six <br />2020 <br />I 2020 <br />e• <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Structural engineer for final design services for the reconstruction of a 3/< -mile section of Okeechobee Road in Miami -Dade County. Services <br />include widening the existing road to 4 lanes in each direction; widening the NW 79th Avenue Bridge over the Miami (C-6) Canal. <br />STANDARD FORM 330 (REV. 812016) PAGE 2 <br />12o- <br />