Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Tori Bacheler Permitting a. TOTAL b. WITH CURRENT FIRM <br />7 4 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., Vero Beach, FL <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Master of Science / Marine and Environmental Biology / Nicholls State FL / Gopher Tortoise Agent / GTA -18-00039 12018 <br />University / 2013 <br />Bachelor of Science / Wildlife Ecology and Conservation / University of <br />Florida / 2009 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Seven years of experience conducting environmental assessments, endangered species surreys, delineating wetlands, designing wetland mitigation <br />and restoration areas, and the permits required and permit limitations for an array of projects. <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />121- <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />Lowson Boulevard Pedestrian Bridges, Delray Beach, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />2020 I <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />a. <br />Environmental analyst responsible for obtaining a General Environmental Resource Permit for the two pedestrian bridges, reviewing natural and <br />social resources within the study area to prepare a Type 1 Categorical Exclusion checklist, conducting listed species survey, wetland/surface <br />water delineation, and examining study area for social resources. Kimley-Horn is completing a set of construction plans for two pedestrian <br />bridges for the proposed pedestrian improvements along Lowson Blvd. The bridges will be on either side of Lowson Blvd. and provide <br />pedestrian connectivity over Lake Worth Drainage District's (LWDD) E4 Canal. These bridges are part of the bicycle lane addition. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PD&E Study for SR 51US 1/Federal Highway from CR A1A to Beach Road, <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />FDOT District Four, FL <br />2012 <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Environmental scientist. PD&E study for the Jupiter Bridge on US 1/Federal Highway between CR A1A and Beach Rd. in Palm Beach County. <br />Our team is evaluating bridge rehabilitation; bridge replacement; various alignment alternatives; no -build. The various alignment and build <br />alternatives will include consideration for a temporary bridge, full bridge closure, or phased construction with traffic on existing bridge. Each <br />alternative will evaluate bringing the bridge up to FDOT standards including options to accommodate pedestrian and bicyclists. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />McNab Road Over Cypress Creek (C-14) Bridge Replacement and Terra <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Mar Drive over Spanish River Bridge Rehabilitation Projects, Pompano <br />Ongoing <br />Ongoing <br />Beach, FL <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />C. <br />Environmental scientist. Responsibilities included preparation of permit application packages for a US Coast Guard Bridge permit and a State of <br />Florida Environmental Resource permit for replacement of the McNab Road over Cypress Creek bridge. Kimley-Horn is providing design and <br />consulting services for two separate bridge projects within the City as part of the current G.O. Bond. The project at McNab Road includes the <br />full replacement of the existing bridge and relocation of existing utilities. Kimley-Horn is leading permitting of this project. Improvements at Terra <br />Mar Drive include repairs to the existing bridge and seawalls to address deterioration. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Midway Road (CR 712) Design and Reconstruction, FDOT District Four, <br />St. Lucie County, FL <br />Ongoing <br />I <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />d. <br />Environmental scientist conducting crested caracara (federally threatened bird species) surveying and ERP and USACE permitting, which <br />includes wetland mitigation coordination with Bluefield Ranch Mitigation Bank. Responsible for permitting the reconstruction of Midway Road <br />from a two-lane, rural roadway to a four -lane, divided urban roadway from west of South 25th Street to east of SR 5 (US 1), for a length of two <br />miles. Also includes replacement of the existing bridge over the North Fork of the St. Lucie River (Aquatic Preserve and Outstanding Florida <br />Water) and retaining walls, drainage ponds, signing, lighting, si nalization, landsca in , irrigation, and wetland mitigation. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Apollo Beach Boulevard Extensionl1-75 Flyover, Hillsborough County, FL <br />Ongoing <br />I Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm <br />e. <br />Environmental analyst responsible for ERP, USACE Section 404 dredge and fill permit, and permitting with the County. Also assisted with <br />creation of suitable, offsite wetland mitigation plan at a County -owned property. Served as a scientist for the Kimley-Horn team designing the <br />extension of the Blvd. from US 41 to Paseo al Mar Blvd. that will result in a 4 -lane facility including the bridge over 1-75 to the eastern limits of <br />the conservation easement or approach tie -down. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />121- <br />