My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pedelta
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Pedelta
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 12:15:43 PM
Creation date
11/23/2020 12:07:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Project Manager a. TOTAL b. WITH CURRENT FIRM <br />Andrea Travani 14 1 <br />15. FIRM NAME AND LOCATION (City and State) <br />PEDELTA Inc.. Coral Gables, Florida <br />16. EDUCATION (Degree and Specialization) <br />MSc. in Civil and Environmental Engineering, <br />University of Trieste (2005). <br />Masters in Project Management, University <br />of Trieste (2006). <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />New York, Georgia, Florida, British Columbia <br />(Canada) and Italy <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />PTI Award of Excellence for the Manhattan West Platform, New York, NY. ASBI – Bridge Award of Excellence, <br />2015 for the SR 826 (Palmetto Expressway) Interchange Improvements. <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />-57- <br />(1) TITLE AND LOCATION (City and State) <br />Manhattan West platform, New York, NY <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2011-2015 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />a. <br />Andrea was the Project Director for the General Contractor. The Project is part of the Manhattan West <br />Development and consists of approx 110,000 sqft. of segmental deck, built over the railways right before the entrance to <br />Penn Station. The structure is made of 16 240ft-long bridges each one made with approximately 40 segments. Each <br />bridge was reinforced with approximately 100 ton of Post Tensioning and weighted 2400 tons. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />Pensacola Bay Bridge, Pensacola, FL <br />2016 -on going <br />b <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />� Check if project performed with current firm <br />Andrea was the overall company responsible for the supply and installation of the stay cable system of the 375ft long <br />twin arch bridge, featuring the first FDOT application of galvanized sheeted strand. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />SR 826 (Palmetto Expressway) / SR 836 (Dolphin Expressway) <br />PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />Interchange Improvements <br />2008-2010 I <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />C. <br />Deputy Project Manager. The scope of work involved designing and building the Precast Yard and the casting & erection <br />equipment, coordinating with the GC and FDOT District 6, reviewing the shop drawings and providing technical support <br />for the construction of this "Spaghetti Interchange" near Miami International Airport. This project consisted.in the <br />prefabrication and erection of 4 bridges <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />Dulles Metrorail Project—Phase 1, Washington DC <br />200s-2010 <br />I <br />d <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Andrea was the Project Engineer. The scope of work involved designing and building the Precast Yard and the erection <br />equipment, reviewing the shop drawings and providing technical support for the construction of the elevated guideway of <br />DC's new Metrorail Silver Line. This project consisted in the prefabrication and erection of around 2500 segments (about <br />4.5 miles of bridges), erected by means of Launching Gantry. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />Dubai Metrorail Project, Dubai, United Arab Emirates <br />2007-2009 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />e <br />Andrea was a Field Engineer. The scope of work consisted in the prefabrication and erection of 35 miles of precast <br />segmental bridges. The erection methods included span by span and balanced cantilever using launching gantries, lifting <br />frames and cranes <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />-57- <br />
The URL can be used to link to this page
Your browser does not support the video tag.