Laserfiche WebLink
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, Block 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below before completing table. <br />Place 'V under project key number for participation in same or similar role.) <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />Juan Sobrino <br />Technical Lead <br />X <br />X <br />X <br />9 <br />5 <br />10 <br />Andrea Travani <br />Proyect Manager <br />X <br />Javier Jordan <br />Sr. Structural Bridge Engineer <br />and QC Manager <br />X <br />29. EXAMPLE PROJECTS KEY <br />4UMBER <br />TITLE OF EXAMPLE PROJECT From Section F <br />NUMBER <br />TITLE OF EXAMPLE PROJECT From Section F <br />1 <br />MDC - Snowden Pedestrian Bridge <br />6 <br />2 <br />Garrison Crossing <br />7 <br />3 <br />1-395/SR 836/1-95 DESIGN -BUILD PROJECT <br />8 <br />4 <br />9 <br />5 <br />10 <br />STANDARD FORM 330 (REV. 8/2U16) PAGE 4 <br />-62- <br />