Laserfiche WebLink
West Lake Park Pedestrian Bridge Sidewalk and Retaining Walls PROFESSIONAL SERVICES CONSTRUCTION Ira Usable <br />Broward County, FL 2013 N/A <br />1(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />e. Principal Engineer. Soil information was required by FDOT along the existing berm and bridge approach (proposed 4 -inch thick concrete <br />sidewalk) at the pedestrian bridge project located at the south of Sheridan Street and east of N 14�h Avenue. Terracon provided <br />subsurface exploration, geotechnical evaluation and engineering recommendations. The scope of work included performing Standard <br />Penetration Test (SPT) borings and auger borings to determine the subsurface conditions along the proposed concrete sidewalk. Firm's <br />Fee: $3,733 <br />-73- <br />STANDARD FORM 330 (REV. 8/2016) <br />