My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3136
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 2:57:34 PM
Creation date
12/9/2020 11:51:42 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3136
Date (mm/dd/yyyy)
11/19/2020
Description
Team Contracting, Inc. for Design & Construction of ADA Stalls & Parking at Gwen Margolis Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
solicitation for a period of 180 Days (or longer, if mutually agreeable to both the Bidder <br />and Sourcewell). <br />8.3 Additionally, the Bidder is required to submit a Management Plan, see Article 9, Section <br />Two Instructions to Bidders. The Bidder's Management Plan will provide Sourcewell <br />information to gauge the responsibility of the Bidder. <br />8.4 A Bidder will not be awarded more than one same scope Agreement within any <br />Geographic Area. <br />8.5 Competitive Range Determination , if a wide margin is found in the Adjustment Factors <br />submitted in response to the solicitation; being too high or too low, then the Sourcewell <br />Bid Review Committee may establish a Competitive Range for the solicitation. if it is <br />determined that a Bidder's Combined Adjustment Factor is too far outside the <br />Competitive Range then the Bidder can be removed from consideration. The Bidder shall <br />be notified that they were determined to be outside the Competitive Range after award of <br />the contracts. <br />8.6 Unbalancing of Bids —A Bid maybe removed from consideration if it is determined that <br />the Bidder has mathematically unbalanced their Bid to gain a competitive advantage. The <br />Bid will be considered to be unbalanced if any Adjustment Factor is found to not cover the <br />contractors reasonable actual cost. Those costs would include a reasonable prorated <br />share of their anticipated profit, overhead cost, and other indirect costs that the bidder <br />anticipates for the performance of the work as determined by the Sourcewell Bid Review <br />Committee. <br />8.7 The Other Than Normal Working Hours Adjustment Factors must be higher than the <br />Normal Working Hours Adjustment Factors. <br />8.8 The Non Pre -priced adjustment Factor without Administrative Fees must be between <br />1.0500 and 1.2000. <br />9. ASSIGNMENT OF WORK <br />9.1 if multiple awards are made, the assignment of the Work is at the sole discretion of <br />the Sourcewell Member. The Contractor's Adjustment Factors, performance history, and <br />ability to perform the Work will be considered in determining the distribution of the <br />Work. <br />9.2 BidSafe: Sourcewell may issue a Request for Quotation (RFQ) to two or more <br />Contractors for a Work Order. Selection of the Contractor and award of the Work <br />Order will be in compliance with established Sourcewell procedures, <br />9.3 Sourcewell reserves the right to utilize Bid Safe on a Work Order by Work Order basis, <br />9.4 Sourcewell will consider several factors when determining the applicability of Bid Safe to <br />a Work Order including, but not limited to, the following: <br />9.4.1 Estimated Work Order Amount; <br />9.4.2 Scope documentation, including but not limited A/E design; <br />9.4.3 Nature and complexity of the Work; <br />9.4.4 iContracto& abilities to self -perform the Work; <br />March 2019 Section Tarn — BnstrLictinn!, to Bidders <br />
The URL can be used to link to this page
Your browser does not support the video tag.