Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 GiANNO FeOli <br />Beachwalk Master Plan <br />Surfside, Florida <br />Lead Designer responsible for the conceptualization and master plan of a 1-mile linear park as a erosion control strategy and connecting <br />all street-end plaza components with access to the beach. This project included dune and turtle habitat restoration, branding sculptures, <br />salt-tolerant plantings, public art branding components, and specialty paving design. Also responsible for all public outreach associated <br />with the project. CGA’s fees: $60,000. <br />2006 N/A <br />Rolling Oaks Park Wayfinding Sign Package <br />Miami Gardens, Florida <br />Developed a signage and wayfinding package to provide identification and orientation to users. The signage package was developed as <br />an interchangeable modular system that could be easily customized to meet the unique needs of other park and public amenity areas and <br />that could be placed on project sites as well as within the public ROW. The design was heavily influenced by concerns of safety and its <br />ability to withstand graffiti and vandalism. CGA’s fees: $140,000. <br />2008 2012 <br />92nd Street Park <br />Bay Harbor Islands, Florida <br />Lead Designer responsible for all public outreach, site design, construction detailing, and planting design of a 2-acre urban community <br />passive park. The park includes a small dog park area, flexible open space, outdoor exercise areas, ample shaded seating, parking, <br />furnishings, and urban plaza and solar- powered security lighting. This project was designed, engineered, detailed and constructed on a <br />fast-track to meet very restrictive deadlines of grant funding that had been previously secured by the Town. CGA’s fees: $40,000. <br />2008 2010 <br />Doral Boulevard Beautification Master Plan <br />Doral, Florida <br />Lead Designer responsible for crafting a streetscape and urban design master plan for Doral Boulevard envisioned as the primary <br />emblem of the City. Responsible for designing all landscape and planning components of the project, which created distinct planning <br />‘character’ zones that would impact relationships of the built environment with the resultant quality of spaces being generated, the <br />creation of dedicated public realm components and design standards for each, access management design recommendations, signage <br />and gateway features, and identifying architectural relationships to improved sidewalk design and parking design recommendations. <br />This document and its vision has been the guiding document for all areas abutting the Boulevard and has been used by the City as a <br />contributing guide for the development of Downtown Doral, focused on safe, pedestrian-friendly, high-quality environments. <br />2004 2013 <br />lloyd estate Pocket Park Project <br />Oakland Park, Florida <br />Responsible for the programming and design of the project site, conducting the necessary public outreach to gather Commission <br />approval and coordinating important aesthetic and sustainable improvements with engineering needs of the project. Also responsible <br />for the conceptual design of all material selections and palette, retaining walls, fences, lighting, branding elements, and planting. CGA’s <br />fees: $65,000 <br />2011 2019 <br />39