h.
<br />19. RELEVANT PROJECTS (CONT.)
<br />f.
<br />e.
<br />d.
<br />g.
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 GiANNO FeOli
<br />Beachwalk Master Plan
<br />Surfside, Florida
<br />Lead Designer responsible for the conceptualization and master plan of a 1-mile linear park as a erosion control strategy and connecting
<br />all street-end plaza components with access to the beach. This project included dune and turtle habitat restoration, branding sculptures,
<br />salt-tolerant plantings, public art branding components, and specialty paving design. Also responsible for all public outreach associated
<br />with the project. CGA’s fees: $60,000.
<br />2006 N/A
<br />Rolling Oaks Park Wayfinding Sign Package
<br />Miami Gardens, Florida
<br />Developed a signage and wayfinding package to provide identification and orientation to users. The signage package was developed as
<br />an interchangeable modular system that could be easily customized to meet the unique needs of other park and public amenity areas and
<br />that could be placed on project sites as well as within the public ROW. The design was heavily influenced by concerns of safety and its
<br />ability to withstand graffiti and vandalism. CGA’s fees: $140,000.
<br />2008 2012
<br />92nd Street Park
<br />Bay Harbor Islands, Florida
<br />Lead Designer responsible for all public outreach, site design, construction detailing, and planting design of a 2-acre urban community
<br />passive park. The park includes a small dog park area, flexible open space, outdoor exercise areas, ample shaded seating, parking,
<br />furnishings, and urban plaza and solar- powered security lighting. This project was designed, engineered, detailed and constructed on a
<br />fast-track to meet very restrictive deadlines of grant funding that had been previously secured by the Town. CGA’s fees: $40,000.
<br />2008 2010
<br />Doral Boulevard Beautification Master Plan
<br />Doral, Florida
<br />Lead Designer responsible for crafting a streetscape and urban design master plan for Doral Boulevard envisioned as the primary
<br />emblem of the City. Responsible for designing all landscape and planning components of the project, which created distinct planning
<br />‘character’ zones that would impact relationships of the built environment with the resultant quality of spaces being generated, the
<br />creation of dedicated public realm components and design standards for each, access management design recommendations, signage
<br />and gateway features, and identifying architectural relationships to improved sidewalk design and parking design recommendations.
<br />This document and its vision has been the guiding document for all areas abutting the Boulevard and has been used by the City as a
<br />contributing guide for the development of Downtown Doral, focused on safe, pedestrian-friendly, high-quality environments.
<br />2004 2013
<br />lloyd estate Pocket Park Project
<br />Oakland Park, Florida
<br />Responsible for the programming and design of the project site, conducting the necessary public outreach to gather Commission
<br />approval and coordinating important aesthetic and sustainable improvements with engineering needs of the project. Also responsible
<br />for the conceptual design of all material selections and palette, retaining walls, fences, lighting, branding elements, and planting. CGA’s
<br />fees: $65,000
<br />2011 2019
<br />39
|