Laserfiche WebLink
m. <br />19. RELEVANT PROJECTS (CONT.) <br />k. <br />j. <br />i. <br />l. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 GiANNO FeOli <br />174th Street Park Bridge Vision Package <br />Sunny Isles Beach, Florida <br />Project Manager/Lead Designer: Responsible for the conceptualization of the bridge and managing the development of all needed graphics <br />to convey the project. Responsible for obtaining a pre-acceptance of the design approach from FDOT-District 6 for an open-air, elevated <br />pedestrian bridge designed more as a park than a caged walkway; Responsible for obtaining acceptance from FDOT for developing a <br />design strategy that did not require the use of metal fencing enclosures; Responsible for all public presentations to the community and <br />to the commission for feedback and approvals. <br />2019 N/A <br />SW 2nd Ave Himmarshee District Streetscape <br />Fort Lauderdale, Florida <br />Project Manager/Lead Designer: Responsible for conceptualizing the streetscape and developing a strategy that reinterpreted the <br />streetscape into an ‘event space’ that was supportive of the existing restaurants and nightclub and bars located in the area. As such, the <br />streetscape was redesigned as a curbless ‘woonerf’. Responsible for the coordination and development of all construction documents. <br />Responsible for coordinating all construction administration support efforts with the Client’s third-party CEI consultant. <br />2018 2019 <br />Urban Forestry Master Plan <br />Miami Beach, Florida <br />Account Manager/Lead Urbanist: Responsible for the development of a city-wide strategy to implement constructability components of <br />the urban forestry master plan through the development of a ‘tool kit’. The ‘tool kit’ satisfied the Planning Department’s needs to establish <br />a city-wide hierarchy for street tree types, establishes standards for incorporating green infrastructure in the planting of city trees, <br />establishes standards for soil volume calculations and stresses the need to have those accounted for during the scoping and budgeting <br />processes, provided for appropriateness of canopy specie selection for good resilient diversity, and provided constructatbility details to <br />be incorporated into the Public Work’s set of standards. <br />Ongoing N/A <br />Middle Beach Recreational Corridor - Phase iii <br />Miami Beach, Florida <br />Account Manager/Lead Designer: Responsible for coordinating all design, engineering and environmental efforts associated the <br />replacement of the existing wooden boardwalk with an on-grade, paver pathway, as well as responsible for all planting and hardscape <br />design. Additionally, the project included the redesign of 11 street ends to provide ADA accessibility, seating areas and beach shower <br />facilities. Participated in one-on-one meetings with all properties prior to construction, responded to residents’ concerns, and addressed <br />design restrictions set forth in the Florida Administrative Code and balanced those against resident’s expectations. Responsible for <br />coordinating with FDEP, FWC, and City of Miami Beach Departments in obtaining all necessary permits; was capable of getting all above- <br />ground pedestrian pole lights approved by FWC. <br />2015 Ongoing <br />North Beach Oceanside Park and Beachwalk <br />Miami Beach, Florida <br />Account Manager/Lead Designer: Responsible for implementing the vision for the park that was collaboratively arrived at in a partnership <br />with West 8. Responsible for the coordination of all City-departments’ request and working closely with CIP staff in the separate <br />development and permitting of the beachwalk component. Responsible for successfully obtaining a CCCL permit for both the park and <br />the beachwalk separately through FDEP and FWC; was capable of getting all above-ground pedestrian pole lights approved by FWC. <br />2015 <br />40