Laserfiche WebLink
Page 12 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01 <br /> <br />3.6 Warehouse and Shipping 950 Checklist <br /> <br />Primary Responsibility: Nick Mader <br />24 - 72 hrs prior to hurricane: Assigned To: Date Completed <br />Cover computer and miscellaneous equipment with plastic <br />and remove from floor where possible Nick Mader <br />Disconnect battery back-ups from wall Nick Mader <br />Place outside materials in warehouse Nick Mader <br />Put all materials possible on pallets Nick Mader <br />Brace and cover up roll up doors Nick Mader <br />Place sandbags or water absorption materials against roll up <br />doors <br />Nick Mader <br /> <br />Ship out as many completed jobs as possible Nick Mader <br />Shut down breakers Nick Mader <br />Charge forklifts and fill propane tanks Nick Mader <br />Produce computer printouts of stock status by customer, <br />category and location (3 total). Maintain offsite. <br />Nick Mader <br /> <br />Fuel all trucks and vans Nick Mader <br />Park as many vehicles as possible in warehouses Nick Mader <br />Take video of the interior, exterior and roof of the building Franz Fernandez <br /> <br /> <br />3.7 Warehouse and Shipping Axis Park Checklist <br /> <br />Primary Responsibility: Joseph Falcon <br />24 - 72 hrs prior to hurricane: Assigned To: Date Completed <br />Cover computer and miscellaneous equipment with plastic <br />and remove from floor where possible Joseph Falcon <br />Disconnect battery back-ups from wall Joseph Falcon <br />Place outside materials in warehouse Joseph Falcon <br />Put all materials possible on pallets Joseph Falcon <br />Brace and cover up roll up doors Joseph Falcon <br />Place sandbags or water absorption materials against roll up <br />doors <br />Joseph Falcon <br /> <br />Ship out as many completed jobs as possible Joseph Falcon <br />Shut down breakers Joseph Falcon <br />Charge forklifts and fill propane tanks Joseph Falcon <br />Produce computer printouts of stock status by customer, <br />category and location (3 total). Maintain offsite. <br />Joseph Falcon <br /> <br />Shutdown the equipment and cover with plastic. Joseph Falcon <br />Take video of the interior, exterior and roof of the building Franz Fernandez <br /> <br />