My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3674
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 9:05:08 AM
Creation date
7/31/2024 3:49:24 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3674
Date (mm/dd/yyyy)
06/20/2024
Description
Approving Agreement w/ Nunez Construction for installation of an ER Generator and Building Restorations at Gateway Community Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.3.3.4 Overhead and Profit <br />(a) Subcontractor's overhead, including supervision and the furnishing, <br />use and maintenance of small tools and ordinary equipment incidental <br />to and required for the Work shall be just and fully compensated for <br />by adding an amount equal to FIVE PERCENT (5%) of the sum of <br />material and labor costs as defined under Subcontractor's profit below, <br />but excluding equipment rental costs. <br />(b) Subcontractor's profit may then be added to the above material costs <br />and labor costs including the Overhead allowance at the rate of SEVEN <br />PERCENT (7%) of the sum of those costs, excluding equipment rental <br />costs. <br />(c) Contractor's overhead, including general supervision and the <br />furnishing, use and maintenance of small tools incidental to and <br />required for the Work accomplished by its own direct labor shall be <br />considered to be just and fully compensated for by adding an amount <br />equal to FIVE PERCENT (5%) of the sum of material and labor costs as <br />defined under Material costs and Labor costs below, but excluding <br />equipment rental costs and bond allowance. <br />(d) Contractor's overhead, including general supervision and the <br />furnishing, use and maintenance of small tools and equipment <br />incidental to and required for the Work accomplished by <br />subcontractors shall be considered to be just and fully compensated <br />for by adding an amount equal to FIVE PERCENT (5%) of the sum of <br />material and labor costs as defined under Material costs and Labor <br />costs below, but excluding equipment rental costs and bond <br />allowance. <br />(e) Contractor's profit may then be added into the above material costs and <br />labor costs, including the Overhead allowance at the rate of SEVEN <br />PERCENT (7%) of the sum of those costs, excluding equipment rental <br />costs. <br />10.3.3.5. Bond Allowance: For maintaining the Public Construction Bond at 100% of the <br />Contract Price, a sum of ONE PERCENT (1%) of the total cost of the change (including <br />material, labor, overhead and profit, and equipment rental) shall be allowed on all change <br />orders. <br />10.3.3.6. Material costs actually recorded by the Contractor and the subcontractor as <br />materials are delivered to the site and, as evidenced from originally receipted invoices, <br />Page 28 of 43 <br />296 <br />
The URL can be used to link to this page
Your browser does not support the video tag.