My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3973
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:28:55 PM
Creation date
3/9/2026 10:25:22 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3973
Date ‎(mm/dd/yyyy)‎
02/19/2026
Description
Approving Agreement w/ Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />by this Contract, or should unknown conditions of an unusual nature differing materially <br />from those ordinarily encountered in the area and generally recognized as inherent in <br />Work of the character provided for in this Contract, be encountered, the Contract Price <br />shall be equitably adjusted by Change Order upon the written notice and claim by either <br />parry made within three (3) days after the first observance of the condition. As a condition <br />precedent to the City having any liability to the Contractor for concealed or unknown <br />conditions, the Contractor must give the City and the City's Representative written <br />notice of, and an opportunity to observe, the condition prior to disturbing it. The failure <br />by the Contractor to make the written notice and claim as provided in this Subparagraph <br />shall constitute a waiver by the Contractor of any claim arising out of or relating to such <br />concealed or unknown condition. <br />8.3.4 Claims for Additional Costs — Except as prohibited in Paragraph 8.3.5 herein <br />below, if the Contractor wishes to make a claim for an increase in the Contract Price, as <br />a condition precedent to any liability of the City therefore, the Contractor shall give the <br />City's Representative and the City written notice of such claim within three (3) days after <br />the occurrence of the event, or the first appearance of the condition, giving rise to such <br />claim. Such notice must be given by the Contractor before proceeding to execute any <br />additional or changed Work. The failure by the Contractor to give such notice and to give <br />such notice prior to executing the Work shall constitute a waiver of any claim for additional <br />compensation. <br />8.3.4.1 In connection with any claim by the Contractor against the City for <br />compensation in excess of the Contract Price, any liability of the City for the <br />Contractor's cost shall be strictly limited to direct costs incurred by the Contractor <br />plus a reasonable mark-up of fifteen percent (15%) for overhead and profit <br />consistent with Paragraph 10.3.3.4 below. Direct costs do not include the <br />Contractor's home office overhead, loss of efficiency, consequential damages of <br />the Contractor, or equipment costs in excess of actual equipment rental paid by the <br />Contractor to a third party. The City shall not be liable to the Contractor for claims <br />of third parties, including Subcontractors, unless and until liability of the Contractor <br />has been established therefore in a court of competent jurisdiction. <br />8.3.5 Claims for Additional Time —If the Contractor is delayed in progressing any <br />task which at the time of the delay is then critical or which during the delay becomes <br />critical, as the sole result of any act or neglect to act by the City or someone acting in the <br />City's behalf, or by changes ordered in the Work, unusual delay in transportation, <br />unusually adverse weather conditions not reasonably anticipatable, fire or any causes <br />beyond the Contractor's control, then the date for achieving Final Completion of the Work <br />shall be extended upon the written notice and claim of the Contractor to the City and the <br />City's Representative for such reasonable time as the City's Representative and the City <br />may determine plus extended, documented general conditions expenses including, among <br />other things, project management, supervision and project site overhead expenses. Claims <br />for delay can only be submitted for consideration in the event they have a direct, <br />documentable impact on the Critical Path of the project as evidenced on the (CPM) <br />schedule. Concurrent delay events impacting the schedule will only be considered as a <br />single impact and will be limited to a non-compensable time extension. Any notice and <br />claim for an extension of time by the Contractor shall be made not more than three (3) days <br />COMTECH ENGINEERING, INC. 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.