Laserfiche WebLink
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />TRANSIENT VOLTAGE SUPPRESSION 16289 - 8 <br />B. Testing: Engage a qualified testing agency to perform the following field quality-control testing: <br />C. Testing: Perform the following field quality-control testing: <br />1. After installing surge protective devices, but before electrical circuitry has been energized, <br />test for compliance with requirements. <br />2. Complete startup checks according to manufacturer's written instructions. <br />3. Perform each visual and mechanical inspection and electrical test stated in NETA ATS, Sec <br /> tion 7.19. Certify compliance with test parameters. <br />D. Repair or replace malfunctioning units. Retest after repairs or replacements are made. <br />E. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect field- <br />assembled components and equipment installation, including piping and electrical connections. Report <br />results in writing. <br />1. Verify that electrical wiring installation complies with manufacturer's installation require <br /> ments. <br />3.4 <br />A. Engage a factory-authorized service representative to train Owner's maintenance personnel to ad- <br />just, operate, and maintain surge protective devices. <br />DEMONSTRATION <br />1. Train Owner's maintenance personnel on procedures and schedules for maintaining suppres- <br />sors. <br />2. Review data in maintenance manuals. Refer to Division 1 Section "Contract Closeout." <br />3. Review data in maintenance manuals. Refer to Division 1 Section "Operation and Mainten <br /> ance Data." <br />4. Schedule training with Owner, through Architect, with at least seven days' advance notice. <br />END OF SECTION 16289 <br />