Laserfiche WebLink
<br />01310 - 3/6 <br />performance testing. Site-related activities shall not reflect a combination of work <br />located in separate structures, work corresponding to different divisions of the <br />specifications, work performed by first and second tier subcontractors or rough in <br />and finish work of the same trade. <br />C. The CONTRACTOR’S Construction Schedule shall reflect the timely delivery of all <br />permanent materials. Procurement activities should include preparation, review and <br />acceptance of shop drawings, material fabrication and material deliveries. <br />D. The CONTRACTOR shall schedule any requirements (such as submittal reviews) of <br />the CITY, the DESIGN CONSULTANT and others (performing work for the CITY) <br />indicated in, or required by the Contract Documents. The Construction Schedule <br />shall incorporate appropriate activities and work sequences based on the Contract <br />Documents. <br />2.02 COST LOADING: <br />A. Each activity in the Contract Schedules shall be assigned a dollar value in <br />accordance with the physical value of that work in relationship to the Schedule of <br />Values. The total budget value of all activities shall equal the Contract Price as <br />broken down by the Schedule of Values per Section 00300. The CONTRACTOR <br />shall also indicate the estimated duration for each construction activity and material <br />quantities for all activities. <br />B. If the WORK includes items covered by allowances, the CONTRACTOR shall cause <br />that work to be done within the limits of the Contract Time. The Construction <br />Schedule shall incorporate the CONTRACTOR’S best estimate of the activities and <br />logic associated with the allowances. <br />2.03 CONSTRUCTION SCHEDULE SUBMITTAL: <br />A. The Construction Schedule submittal is to consist of a Detailed Construction <br />Schedule Graphic Report, Schedule Narrative report, and an electronic copy of the <br />schedule data. <br />B. Construction schedule shall include the City holidays as holidays and no major work <br />should be scheduled for these holidays. <br />C. The Schedule Narrative Report shall consist of a written description of how the work <br />will be accomplished in accordance with the planned Construction Schedule. The <br />Schedule Narrative accompanying each Schedule Update shall, at a minimum, <br />compare current early dates against baseline dates for all milestones and <br />discussions of progress and/or delays. It shall provide sufficient detail to allow the <br />CITY to verify the progress of the WORK, compare actual versus planned activities, <br />identify assumptions made in scheduling change order work, describe actual or <br />potential delays and related causes, define steps taken to mitigate delay impacts and <br />itemize any proposed changes in network activities and logic. The CONTRACTOR <br />shall direct specific attention, in writing, to adjustments or corrections made, either in <br />response to the CITY’S comments on the previous submittal or otherwise. <br />D. The Schedule Narrative shall include cost data on monthly and cumulative totals for <br />all items depicted in the Schedule of Values as statuses in the current revision of the <br />Construction Contract Schedule. There shall be an additional report required to <br />account for stored materials utilizing the specified Stored Materials Report form.