My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Manuel Synalovski Assoc., LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Manuel Synalovski Assoc., LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 3:14:23 PM
Creation date
2/10/2016 3:03:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> 3. Building Development <br /> a. Development and refinement of building and other drawings necessary to illustrate the <br /> • a entire project. <br /> • b. Preliminary overlay of architectural, structural and MEP. <br /> • c. Delineation of materials and proposed type of construction. <br /> d. Preliminary interior design space layouts. <br /> • <br /> • 4. Final Schematic Design <br /> a. Refinement of floor plans and structural, MEP systems, interior design <br /> • b. Preparation of outline specifications <br /> c. Code review and summary <br /> • <br /> • Upon approval by City's Project Manager, the Project will advance to the Design Development Phase <br /> • DESIGN DEVELOPMENT PHASE <br /> • <br /> • The services in this task shall include but not be limited to, (assume two meetings for this phase): <br /> • 1. The Design Development Documents will be developed as outlined in the timeline identified in the <br /> • initial Design Meeting. <br /> • <br /> • 2. Finalize plan layout & design details; establish equipment quantities, locations and functions; <br /> determine material selections. Immediately following authorization to proceed with Design <br /> • Development, the City's Project Manager will schedule a meeting with the Architectural firm. <br /> • The meeting agenda items include: <br /> 0 a. Project Scope <br /> b. Project Design Review <br /> • c. Project Schedule <br /> • d. Codes and other pertinent item which may arise <br /> • e. Architect to update the FTP site for the project with AutoCAD files and pdf files of all <br /> ® drawings per phase. <br /> • 3. Design Development drawings are considered an extension of the Schematic Design drawings <br /> • and the beginning of Construction Documents. All drawing sheets are intended to be developed into <br /> ® Construction Documents and therefore, shall meet the standards for Contact Documents including <br /> numbering formats. <br /> • <br /> • Upon approval by City's Project Manager, the Project will advance to the Contact Document Phase <br /> • <br /> • <br /> • <br /> • <br /> • Vj <br /> • <br /> RFQ # 12-04-02 9 <br /> wANua it a ASSOCIATES,UC <br /> nueni <br /> • J <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.