Laserfiche WebLink
<br />" <br /> <br />.'--..J <br /> <br />n <br /> <br />L..J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />(' <br /> <br />LJ <br /> <br />n <br /> <br />'--..J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />r, <br /> <br />L-..J <br /> <br />n <br /> <br />u <br /> <br />II <br /> <br />LJ <br /> <br />(~l <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />(' <br /> <br />L..J <br /> <br />(' <br /> <br />LJ <br /> <br />r, <br /> <br />u <br /> <br />SECTION 02490 <br /> <br />TREES, PLANTS AND GROUND COVER <br /> <br />PART 1- GENERAL <br /> <br />1.0 I SCOPE OF WORK <br /> <br />A. <br /> <br />Provide all labor, materials, necessary equipment and services to complete the Trees, <br />Plants and Groundcover work, as indicated on the drawings, as specified herein or both, <br />except as for items specifically indicated as "NIC ITEMS". <br /> <br />1.02 RELATED WORK <br /> <br />A. Section 02210 - Fine Grading <br /> <br />B <br /> <br />Section 02481 - Shrub and Tree Relocation <br /> <br />C. <br /> <br />Section 02484 - Soil Preparation and Soil Mixes <br /> <br />D. Section 02487 - Sodding <br /> <br />1.03 QUALITY ASSURANCE <br /> <br />A. <br /> <br />Inspection <br /> <br />1. <br /> <br />Furnish plant materials inspected by State Department of Agriculture at the <br />growing site and tagged or otherwise approved for delivery by Landscape <br />Architect. <br /> <br />2. <br /> <br />Inspection at growing site does not preclude right of rejection at project site. <br /> <br />B. <br /> <br />Furnish plant materials certified by State Department of Agriculture to be free from <br />harmful insects or apparent disease. Verify that all plant material is free of harmful <br />insects and disease. <br /> <br />C. <br /> <br />All plant material shall be Florida # I or better as defined by the Florida Department of <br />Agriculture "Codes and Standards for Nursery Plants Part I and II". <br /> <br />D. <br /> <br />Plant material shall be shade or sun grown, and/or acclimatized depending on planting <br />location. <br /> <br />1.04 SUBMITTALS <br /> <br />06/05 <br /> <br />A. <br /> <br />Certificate of inspection of plant material by State Authorities. <br /> <br />B. <br /> <br />Test Reports: Analysis of samples from planting soil supply areas. <br /> <br />C. <br /> <br />Maintenance Instruction: Prior to the end of the maintenance period, furnish three <br />copies of written maintenance instructions to the Owner's Representative and Landscape <br /> <br />02490-1 <br /> <br />03-4138.8 <br />