Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH I PROFESSIONAL ARCHITECTURAL SERVICES <br /> <br />PROJECT EXPERIENCE (Last 5 Years) <br />HISTORIC RESTORATION <br /> <br />Young Men's Preparatory Academy I Phase I <br />21.000 Sq. Ft. <br /> <br />Miami-Dade County Public Schools <br />Victor Alonso, Project Manager <br />305.995.4502 <br /> <br />.,' . ii <br />~ 118:1 C. Ii f ,I <br />'II'.. ... I I 'I' <br />, '.. , , . ' . <br />. I ._... ..... I. .. ~ I <br /> <br />~ <br />-~II'!l1 LL <br /> <br /> <br /> <br />"--~ <br /> <br />...~~ <br />' I-.~~,;f~~ <br />-rif; ~mv <br />--L- <br />- <br /> <br />The project at Young Men's Preparatory Academy was a multi-phase project that involved the renovation, <br />remodeling, and restoration of an existing historic structure as well as the new construction of a new state of- <br />the-art building after the demolition of two severely damaged buildings. The architectural process began with <br />field investigations. When the conditions field study was completed, research was conducted to select the best <br />products for replacing the windows and HV AC units as well as materials for interior and exterior refurbishments. <br />The scope of work for the historic restoration portion of the project included but was not limited to the removal <br />and replacement of the windows and HV AC units in the entire facility. In addition, the architect was in charge <br />of replacing paint, ceiling, and lighting throughout the entire facility as well as the renovation of the cafeteria, <br />auditorium, and supporting spaces. The 1926 designed auditorium was restored to its original luster taking into <br />consideration the latest technological and environmental advancements. The Remodeling / Renovation <br />included new stage lighting and rigging, lighting throughout. HV AC system, stage and seating area, curtains, <br />seating to accommodate accessibility, sound system, dimmer. CCTV and control booth. <br /> <br />Fienberg / fisher Elementary School <br />124,000 Sq. Ft. <br /> <br />Miami-Dade County Public Schools <br />Sammy Williams, Project Manager <br />305.995.4703 <br /> <br />I..'" <br />11. <br /> <br />~~, <br />' . , <br />"!t'" I _ <br />I <br /> <br />This project involved the complete Historic Restoration, Renovation, and Remodeling of the entire elementary <br />school. Architeknics, Inc. was entrusted with updating the existing classrooms, administration offices, <br />gymnasium, and structure with state-of-the-art materials and solutions to allow the elementary school to be <br />more efficient while creating a better environment for learning. The main scope of work for this project was the <br />removal and replacement of the windows and HV AC units in the entire facility. In addition to the window and <br />HV AC replacement. the architect was in charge of replacing interior/exterior paint and ceilings throughout the <br />entire facility. In addition, Architeknics, Inc. provided complete Construction Administration with weekly site <br />visits, comprehensive site visit reports, and administration at construction progress meetings. <br /> <br />W.J. Bryan Elementary <br />64,000 Sq. Ft. <br /> <br />Miami-Dade County Public Schools <br />Sammy Williams, Project Manager <br />305.995.4703 <br /> <br />ILL_ <'L' <br />,~- '. .::'~ <br /> <br />I~ i'lf':" <br /> <br />This project involved the complete Historic Restoration, Renovation, and Remodeling of the entire elementary <br />school. Architeknics, Inc. was entrusted with updating the existing classrooms, administration offices, and <br />structure with new, efficient materials and solutions to provide for a better learning environment. The main <br />scope of work for this project was the removal and replacement of the windows and HV AC units in the entire <br />facility. In addition to the window and HV AC replacement. the architect was in charge of replacing <br />interior/exterior paint. ceiling and interior/exterior lighting throughout the entire facility. In addition, Architeknics, <br />Inc. provided complete Construction Administration with weekly site visits, comprehensive site visit reports, and <br />administration at all construction progress meetings. <br /> <br />~ <br />~ <br />.'....-;:..'" <br /> <br />ra <br />