Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH I PROFESSIONAL ARCHITECTURAL SERVICES <br /> <br />SITE ADAPTATIONS <br /> <br />Miami-Dade County Public Schools I Modular Program <br /> <br /> <br />. ~ '0. "'~' ". <br />...,~~ " " ~ <br /> <br />z <br /> <br />, /' f' / ~ <br />L--" L' <br /> <br />Miami-Dade County Public Schools <br />Shari Lee, Project Manager <br />305.995.1446 <br /> <br />The aim of these projects at 11 different Miami-Dade County Public School Sites was aimed to add as many <br />student stations as possible to the school campuses while minimizing the impact of the addition on areas of <br />high importance. The student stations were added with the construction of a Prototypical Modular Classroom <br />Building developed by Miami Dade County Public Schools (M-DCPS) to alleviate overcrowding. Due to the <br />limited site conditions on several of the project sites, the program required the removal and replacement of <br />existing buildings, shelters, playground equipment and playfields. In conjunction with the additions and <br />renovations, access and verification of utility services, including electrical, sanitary and fire sprinkler services, <br />were carefully considered with upgrades to Fire Alarm and Public Address Systems. Below you will find a listing <br />of the Design Services Architeknics, Inc. was in charge of providing: <br /> <br />New Parking / New Fire Pump / New Playcourts / New Chiller Building / New Main Electrical Room <br />New Covered Walkways / New Drop-Off Drive / New Prototype Replacement P.E. Shelter <br />New Flammable Storage Room / New Lift Stations / Sewer Main Extensions <br />Upgrade Main Electrical Room / New Outdoor Support Spaces <br /> <br />WINDOW REPLACEMENTS <br /> <br />Miami Shores Elementary <br />52,000 Sq. Ft. (Buildings) I 7,000 Sq. Ft. (Windows) <br /> <br />~... <br /> <br />III .,... <br /> <br /> <br />Miami-Dade County Public Schools <br />William Hetzer, Project Manager <br />305.238.5478 <br /> <br />- \!;i~- <br />~~~~:~;=Ltk6~.B <br /> <br /> <br />The project at Miami Shores Elementary includes the complete removal and replacement of the windows and <br />HV AC units in the entire facility. In addition to the window and HV AC replacement. Architeknics, Inc. is in <br />charge of replacing interior/exterior paint throughout the entire campus. Architeknics, Inc. will provided <br />complete Construction Administration with weekly site visits, comprehensive site visit reports, and administration <br />at all construction progress meetings. <br /> <br />HISTORIC RECONSTRUCTION <br /> <br />Normandy Shores Golf and Country Club <br />7,000 Sq. Ft. (Clubhouse) 16,000 Sq. Ft. (Cart Barn) <br /> <br /> <br />City of Miami Beach <br />Humberto Cabanas, Project Manager <br />305.673.7071 <br /> <br />This project included the demolition, new construction and renovation of the golf cart barn, maintenance <br />buildings, and the toilet buildings throughout the newly renovated golf course. Architecknics, Inc. was also in <br />charge of designing the new construction of the clubhouse to reflect the original historic design of the previous <br />clubhouse that was demolished due to severe damage. The new design maintained the original comfort and <br />richness of the historic structure by restoring many of its key features including an Entry Loggia, Lounge, Pro- <br />Shop, Indoor and Outdoor Dining looking out onto the course, and Kitchen with loading dock and trash room. <br /> <br />i).~~ <br />~....., ....:~. <br />......:.../' <br /> <br />ra <br />