Laserfiche WebLink
<br />SR-112 Toll Plaza Conversion. rvlldrm Odde County. Florida - Project consisted of three <br />primary elements: roadway, toll plaza, and employee parking area. The roadway portion <br />consisted of expanding the merging and diverging areas, correcting roadway cross slope, <br />drainage, signing & pavement markings, maintenance of traffic and roadway lighting. The <br />toll plaza portion consisted of the conversion of two dedicated Sun Pass lanes to express <br />Sun Pass lanes, removal of a automatic coin machine lane, and the conversion of a <br />automatic coin machine lane to a manual booth lane. The removal of the automatic coin <br />machine lane provided the needed space for the proposed express SunPass shoulders. <br />The existing high canopy was replaced with a gantry over the proposed express SunPass <br />lanes. The existing employee parking was reconfigured as part of the project. <br /> <br />MIC Earlington Heights Connector Site Civil Engineer for the Miami Illtfrmodal <br />Center Earlington Heights Station. The Miami Intermodal Center- Earlington Heights <br />projects runs from the existing Earlington Heights Station located next to SR-112 and <br />approximately east of NW 27th Avenue west to the new MIC Core Facility locate next to <br />the Miami International Airport. The project included the site civil design. Served as the <br />designer of record for the maintenance of traffic (including SR-112 & NW 41 st Street), <br />detour plans for the MIC-Earlington (crossing), Signing and Pavement Marking (including <br />SR-112 and NW 41 st Street), signalization design, temporary signal, and substation <br />design. Our site civil department, as part of the design team, has been involved in monthly <br />coordination meetings with Miami-Dade Transit Agency representatives, <br />architects/engineers and system consultants <br /> <br />., W 62 Avenue (SW2.Jrn';treet to NW [/1 Street) Miami' Dade Count~ tl Served as senior project engineer <br />for this project. Prepare a Contract Plans Set for the total reconstruction of a 2.0 mi segment of this urban corridor. <br />Including upgrading one signalized intersections from span-wire to mast-arm, implementation of a traffic safety study, <br />compliance with ADA requirements, drainage design, signing & pavement markings, maintenance of traffic and the <br />design of a new street lighting system. <br /> <br />OmETRIC <br />~ ENGINEERING <br /> <br />WHY THINGS WORK <br /> <br />ALLAN B SE:.QUllI~A P.E. <br /> <br />Project f nqlnE'E'r <br /> <br />NW 36 Stn.,.t (~R 9~~) ~[ I..JW 12'1 Avenue (SR 969) Grade Separation F- LJ fly <br />m Mii'lllll D,.jr County f) r DOT District 6 - The study focuses on providing a grade <br />separation at the intersection of NW 36th Street and NW nnd Avenue to relieve congestion <br />while retaining and integrating the local access and traffic movements. The proposed <br />improvement is to construct a NW 36th Street through movement overpass over NW 72nd <br />Avenue to enhance systemwide traffic operations in the area. This project will be <br />developed following the ETDM methodology. A preferred alternative will be recommended <br />on a review and analysis of all engineering, environmental, and public involvement issues <br />related to the project. Reports include Design Traffic Technical Memorandum, Preliminary <br />Engineering Report, Conceptual Design Roadway Plan Set, Drainage, Geotechnical and <br />Environmental reports. <br /> <br />City of Miami. Silver Bluff Traffic Calming Phase II (Project No. B 301 (j8B) dnd <br />Priority III (Project No B30168A), Design of Traffic Calming Devices The project <br />involved the modification of 10 existing intersections within the Silver Bluff Area of the City <br />of Miami with Traffic Calming Circles. The design included geometry re-alignment, <br />grading, minor drainage improvements to prevent creating any drainage issues, and <br />signalization to meet Miami-Dade County Public Works and City of Miami standards. <br /> <br />City of Miami Traffic Calmmg Grove Area, Project No. B.30037A DeSign -:IT Trdfflc <br />Calming Devices The project involved the modification of 4 existing intersections within <br />the Coconut Grove Area of the City of Miami with Traffic Calming Circles and Flat-Topped <br />Speed Hump. The design includes geometry re-alignment, grading, minor drainage <br />improvements to prevent creating any drainage issues, and signalization to meet Miami- <br />Dade County Public Works and City of Miami standards. <br /> <br />City of Miami, Flagami Traffic Calming Priority IV, Project No. B40672A Design of <br />Traffic Calming Devices The project involved the modification of existing intersections <br />within the City of Miami with Traffic Calming Circles. The design included geometry re- <br />alignment, grading, minor drainage improvements to prevent creating any drainage issues, <br />and pavement markings to meet Miami-Dade County Public Works and City of Miami <br />Standards. <br /> <br />I:-DUCATION <br />B.S.C.E., Florida <br />International University, <br />(1999) <br /> <br />PROF-E:SSIONAL <br />REGISTRATIONS <br />Florida P.E. #60737 (2004) <br /> <br />YEARS OF EXPERIEN( F <br />1 0 years <br /> <br />PROFESSIONAL <br />EXPERIENCE: <br />Mr. Sequeira has 11 years of <br />experience working as a <br />Transportation Engineer in <br />conjunction with the Florida <br />Department of <br />Transportation and local <br />agencies. Mr. Sequeira has <br />worked on a number of <br />projects including RRR and <br />Roadway Reconstruction <br />projects. Within these <br />projects, Mr. Sequeira has <br />conducted flexible pavement <br />design, and produced traffic <br />control, drainage, cross <br />sections, signalization, <br />signing and marking. He has <br />mastered the use of design <br />software tools including <br />MicroStation va, Geopak, <br />GuideSign, AutoTurns, and <br />Arcview. <br /> <br />CERTIFICATIONS: <br />Advanced Maintenance of <br />Traffic, Signals Level 1 , <br />Geopak Road 1, Concrete <br />Pavement Design, <br />Construction and <br />Rehabilitation, and Flexible <br />Pavement Design. <br /> <br />CONTINUING EDUC A TlON <br />FDOT Advanced <br />Maintenance of Traffic <br />Certified <br />Survey Workshop <br />FDOT 04 OC <br /> <br />0FFIC F I OrATION Miami <br />