Laserfiche WebLink
<br />12. NAME <br />Raghu Veturi, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Sr. Traffic Analyst <br /> <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />7 3 <br /> <br />15. FIRM NAME AND LOCATION (CityandSlale) <br />CPH Engineers, Inc./Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. - Civil Engineering, 2001, Nagarjuna University, India <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Professional Engineer <br /> <br />M.S. - Transportation Engineering, 2003, University of <br />Massachusetts, Lowell <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc) <br />Institute of Transportation Engineers (ITE), American Society of Civil Engineers (ASCE) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Belle Terre Parkway Roadway Widening Traffic Analysis, City of Palm PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Coast, Florida 2007 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Sr. Traffic Analyst - Conducted analysis in support of the design of the widening of Belle Terre Parkway. Length of project was approximately four miles. <br /> Services included Traffic Analysis, Access Management, Traffic Signal Warrant Analyses Traffic Signal Timing Design. Fees for services totaled $35,000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Brushwood Lane Intersection Analysis and Improvements, PROFESSIONAL SERVICES CONSTRUCTION (1f Applicable) <br /> City of Palm Coast, Florida 2006 2006 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Sr. Traffic Analyst - Qualitative analysis of design options, signal warrant analysis, and conceptual design of intersection improvements to avoid the need <br /> for a traffic signal (to maintain level of service) but also improve safety and traffic operations, minimize cut-through traffic, and minimize impacts to <br /> stakeholders. Recommended concept was designed and construction was managed by CPH Engineers. Scope of project included two intersections <br /> approximately 700 feet apart and associated turn lanes and traffic control devices. The fees for the analysis and conceptual design totaled $8,500. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Progressive Auto Insurance - Trip Generation Study PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2006 <br />C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Sr. Traffic Analyst - Hillsborough County required that an alternate trip generation rate for proposed Auto Insurance Concierge center be determined, as the <br /> Institute of Transportation Engineers (ITE) does not have data for land uses similar to the proposed site. Accordingly, CPH conducted a trip generation <br /> study by selecting three existing Progressive Auto Insurance Concierge Centers. CPH has coordinated 72-hour machine counted traffic volume counts at <br /> these three (3) sites, trip generation rate analysis and calculations, and prepared a report per ITE methodologies and procedures. <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> Bank of America Traffic Impact Study Review PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2007 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Sr. Traffic Analyst - CPH Engineers assisted the applicant with the review of a Traffic Impact Study prepared by a City of Sarasota Consultant. Several <br /> land use scenarios were evaluated and modified to address concurrency issues, CPH was required to work with City of Sarasota staff and their Consultant <br /> closely to arrive at a mutually agreed upon detailed analysis and mitigation improvements which addressed the impacts of the project yet still allowed the <br /> City to adhere to the Comprehensive Plan and Zoning Code. <br /> (1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br />e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />