Laserfiche WebLink
<br />e <br /> <br />--' <br /><{ <br />If) <br />o <br />"'- <br />o <br />"" <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />'" <br /><{ <br />"'- <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br />f- <br />o <br />f- <br /> <br />ei <br /> <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />g <br />u <br />If) <br />o <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />ozonation pilot test. Produced preliminary design for <br />bioremediation and ozonation system. \'\!rote <br />specifications and work plan for interim and final site <br />remedial action for site dewatering and soil exca\'ation. <br />Site closure obtained following exca\'ation and natural <br /> <br />. .. <br />attenuation monltonng. <br /> <br />Design Engineer, Potable Water Treatment System <br />Design, St. Croix, USVI (1994). Designed, specified, <br />and bid 260-gpm groundwater treatment system for a <br />potable well field impacted \V1.th aromatic hydrocarbons. <br />The system used a cooling tower as a roughing stripper <br />to reduce loading to a tray stripping unit and to oxidize <br />and settle out high-inorganic loading. <br /> <br />Design Engineer, Pharmaceutical facility, Miami, <br />FL, (1992-1994). Design engineer for a facility impacted <br />\vith PCE and TCE in soil and groundwater. f\ five-well <br />groundwater recO\'ery and treatment system with SVE <br />has reduced PCE and TCE concentrations from as high <br />as 380,000 ppb to less than 1 ppb in all monitoring wells. <br />Fluor Daniel GTI recei\'ed an incentive award for <br />maintaining the project ahead of schedule. <br /> <br />Remedial Design Engineer, Manufacturing facility, <br />Miami, FL, (1993-1994). Served as remedial design <br />engineer for a manufacturing facility impacted by <br />chlorinated solvents within the Biscayne .-\cluifer. The <br />recovery and treatment operation reduced PCE and <br />TCE concentrations by more than 95 percent. <br /> <br />Design Engineer, Industrial facility, Orlando, FL, <br />(1992 -1997). Designed remedial system for diesel <br />contamination beneath a process operation floor for an <br />airline support equipment manufacturing facility. The <br />design included separate-phase product recovery, <br />ground-water recovery and treatment, SVE, air sparging, <br />and land farming. <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />ERNEST F. MOTT-SMITH, P.E. <br /> <br />4 <br /> <br />OGe 122006T <br />