Laserfiche WebLink
<br />. <br /> <br />-' <br /><{ <br />If) <br />o <br />"'- <br />o <br />"" <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />" <br /><{ <br />"'- <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br />f- <br />o <br />f- <br /> <br />.i <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />g <br />u <br />If) <br />Ci <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />I-Iydrobin Ash storage facility and the \vaterfront <br />Structures of the fuel handling terminal at Brayton Point <br />power station in Somerset, t\lA. <br /> <br />Other experience include the design of mat and pile <br />foundations supports for Ball Mills, compressors, steam <br />and gas turbines, motors and pumps at the Brunner <br />Island P A. Power plant. <br /> <br />The following is a summary of key projects: <br />Design Engineer, Route 2A over 1-95, <br />Massachusetts Highway Department, Lexington, <br />09/2003 - Present. Project ~Ianager/Engineer. <br />Responsible for the design of a four span continuous <br />steel girder bridge to be constructed in phases and <br />includes traffic management. Additional responsibilities <br />inclu~~d the preparation of construction plans, special <br />proVISions, costs estimates as well as construction phase <br />serVIces. <br /> <br />Design Engineer, Prospect Street over spring street, <br />612483.02, Massachusetts Highway Department, <br />Montague, 09/2002 - Present. Project <br />t\[anager/Engineer responsible for the design of a single <br />span prestressed concrete spread box beam on spread <br />Footings. Additional responsibilities included the <br />preparation of construction plans, special prO\'isions and <br />cos ts es tima tes <br /> <br />Design Engineer, Central Artery Tunnel - Contract <br />C09C2, 1-90/1-93 Interchange, Surface Restoration, <br />Massachusetts Highway Department, Boston, <br />10/2001- 06/2004. Responsible for the design of <br />retaining \valls along Ramp KK, Ramp CC, Ramp U. <br />Other responsibilities include the design of load <br />distribution slab and retaining walls over EPS structure <br />for Temporary Ramp KK. ,\dditional task involved the <br />re\'iew of shop drawings. <br /> <br />Design Engineer, Cross Street over B&M Railroad <br />, <br />Massachusetts Highway Department, Somerville, <br />06/2002 - 03/2003. Responsible for the final design <br />phase of the Through Cirder Superstructure and <br />modifications to the existing substructure. Additional <br />responsibilities included the preparation of construction <br />plans, special provisions and costs estimates. <br /> <br />10/1998 - OS/2002, Task Engineer, Shaw <br />Environmental & Infrastructure, Inc., <br />Stoughton, MA <br />Design Engineer responsible for the preparation of <br />design alternatives for bridge projects, sketch plans and <br />final design. ,\dditional responsibilities include the <br />preparation of construction plans, special provisions and <br />cost estimates. <br /> <br />The following is a summary of key projects: <br />Design Engineer for ramp F (Sta. 20+00 to 22+67.7) <br />and Reviewer for Ramp D, Route 122 over Millers <br />River, Massachusetts Highway Department, <br />Orange, 10/1998 - 09/2001. Design of Railing/Barrier <br />support slab along Water Street. Preparation of final <br />cost estimates. Other responsibilities invoked the <br />re\'i~w of shop drawings and other construction phase <br />services. <br /> <br />Independent Reviewer of both substructure and <br />superstructure design, Big Brown Rail Spur, Texas <br />Utility, TX, 11/1998 - 07/2000. Independent Re\'ie\ver <br />for the Superstructure and Substructure design Union <br />Pacific-Trestle O\'er Clear Creek and Superstructure <br />design Union Pacific-Trestle m'er Caney creek. <br />Prepared the Type study and final design of the Rail <br />Spur O\'er Techuacana Creek. <br /> <br />Project Engineer, C2C Fiber, 13143, C2C Fiber of <br />Massachusetts, 1-495 Corridor, 04/1999 - 09/2001. <br />Conduit Attachments Responsible for bridge inspections <br />and ratings of o\'cr thirty bridges under contract with for <br />C2C Fiber, a fiber optic company as part of it's mainline <br />and lateral installation of fiber Optic cable along 1-495 <br />from Plainville to Tewksbury using Virtis Bridge rating <br />software. Other responsibilities included preparation of <br />conduit attachment details on bridges. <br /> <br />Design Engineer, US 5 over 1-91, 12000, Vermont <br />Agency of Transportation, Hartland, 09/2000- <br />02/2001. Prepared the Engineering Report for the deck <br />replacement and substructure rehabilitation of US 5 <br />overI-91 in Hartland, Vermont and US 5 over 1-91 in <br />Putney in Vermont. Both bridges are multi-span simply <br />supported composite stringer steel girder bridges on <br />skewed tangents. In these reports, the elimination of <br />deck expansion joints and a comparison study of the <br />Vermont Expansion Joint and the X.j.S. (Expansion <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />2 <br /> <br />OGC122006T <br /> <br />SYLVESTER N. YONGHO <br />