Laserfiche WebLink
<br />. <br /> <br />.i <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />o <br />-' <br />u <br />If) <br />Ci <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Joint System) joint system by Dow Corning was <br />undertaken. <br /> <br />--' <br /><{ <br />If) <br />o <br />"'- <br />o <br />"" <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />" <br /><{ <br />"'- <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br />f- <br />a <br />f- <br /> <br />01/1998 - 10/1998, Project Engineer, T.Y. <br />Un International, Boston, MA <br />Project Engineer responsible for the preparation of <br />integrated construction shop drawings incorporating <br />bridge utilities, reinforcements, post-tensioning cables <br />for the Charles River Cable Stayed bridge. Other <br />responsibilities included the redesign of a four span <br />continuous cast-in-place post-tensioned multi-cell <br />concrete box girder. <br /> <br />The following is a summary of key projects: <br />Project Engineer, Central Artery Tunnel - Contract <br />CI9Dl, Charles River Cable Stay bridge, <br />Massachusetts Highway Department, Boston, <br />01/1998 - 10/1998. Preparation of integrated <br />construction shop drawings incorporating bridge <br />utilities, reinforcements, post-tensioning and cables in <br />the struts and lifts I to 5 of the south tower and spline <br />beam of approach back spans to \vhich the cables are <br />attached. Other responsibilities included the <br />identification and resolution of conHicts in the post- <br />tensioned strand laHlutS. <br /> <br />Project Engineer, Central Artery Tunnel - Contract <br />C07D2, 1-90 Logan Airport Interchange, <br />MASSPORT Authority, Boston, 01/1998 - 10/1998. <br />Redesign of Ramp DTA, a four span horizontally cUlTed <br />continuous cast-in-place post-tensioned multi-cell <br />concrete box girder on drilled caissons. Other <br />responsibilities included the review of shop drawings for <br />other Logan l\irport terminal roachvay ramps including <br />the redesign of transverse post-tensioned tendons for <br />end beams, straddle bents and bent caps. <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />SYLVESTER N. YONGHO 3 <br /> <br />06C122006T <br />