|
<br />e
<br />
<br />..J
<br /><{
<br />(/)
<br />a
<br />a.
<br />a
<br />a::
<br />a.
<br />(/)
<br />I
<br />>-
<br />u.
<br />a
<br />w
<br />CJ
<br /><{
<br />a.
<br />~
<br />>-
<br />>=
<br />W
<br />I
<br />>-
<br />Z
<br />a
<br />z
<br />a
<br />>=
<br />u
<br />ii"
<br />>-
<br />(/)
<br />w
<br />a::
<br />w
<br />I
<br />>-
<br />a
<br />>-
<br />ei
<br />(/)
<br />'!l
<br />>-
<br />w
<br />W
<br />I
<br />(/)
<br />(/)
<br />I
<br />>-
<br />z
<br />a
<br />o
<br />w
<br />z
<br />;(
<br />>-
<br />z
<br />a
<br />u
<br /><{
<br />>-
<br /><{
<br />o
<br />u.
<br />a
<br />w
<br />a::
<br />::::>
<br />(/)
<br />a
<br />..J
<br />u
<br />(/)
<br />i5
<br />a::
<br />a
<br />w
<br />(/)
<br />::::>
<br />
<br />e
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />06/1986 - 12/1988, Senior Electrical
<br />Engineer, Stone & Webster, Electrical,
<br />Boston, MA
<br />As Senior Electrical Engineer, t\[r. Eskinazi re\'icwcd
<br />major electrical calculations and system design for the
<br />Comanche Peak - Unit 1 Nuclear Power Plant. He also
<br />reviewed calculations for the sequential loading of the
<br />emergency diesel generators, DC batteries and battery
<br />chargers, short circuit, and \'oltage profile calculations.
<br />He validated the entire plant lighting system, including
<br />IOCFR50 Appendix "R" retluirements.
<br />
<br />06/1987 - 02/1988, Assistant Project
<br />Manager, Stone & Webster, Project
<br />Management, Sequoyah, TN
<br />As Assistant Project J\Ianager, t\[r. Eskinazi coordinated
<br />all engineering and construction support services for the
<br />Sequoyah Nuclear Plant prestart program. These
<br />ser\.ices included analysis and redesign of pipe supports
<br />and supports of major components, resolution of
<br />integrated dcsign inspcction by the NRC, consulting to
<br />the Client management team, and field cngineering
<br />sCr\'ices in support of construction. Thc project
<br />organization was comprised of 350 engineers and
<br />administrati\'e personnel assigned to five office locations
<br />and at thc construction site.
<br />
<br />He also prepared proposals, ncgotiatcd contract and
<br />implemented the \\iork under accelerated schedulcs and
<br />expedited collection of payments.
<br />
<br />The following is a summary of key projects:
<br />Project Manager, Sequoyah Nuclear Plant, Unit 2,
<br />Tennessee Valley Authority, TN, 06/1987 - 02/1988.
<br />Prm'ided project management and cost and schcdule
<br />controls for enginecring and design contract.
<br />
<br />Accomplishments:
<br />
<br />Coordinated all engincering and construction support
<br />services for the Sequoyah Nuclear Plant prestart
<br />program. Prepared proposals, negotiated contract and
<br />implemented the work under accelerated schedules and
<br />cxpedited collcction of paymcnts.
<br />
<br />Project Manager, Workshop for Managing Small
<br />Projects, Stone & Webster, Boston, MA, 03/1983 -
<br />05/1984. Developed training workshop.
<br />
<br />l-\ccomplishments:
<br />De\'eloped a comprehensive workshop for training key
<br />senior le\'c! employees in the proper management,
<br />administration, and execution of small and lump-sum
<br />turnkey domcstic and international projects. Developed
<br />and implemcnted markcting and operation activitics for
<br />the company's Business Devclopment Plan for thc
<br />country of South Africa.
<br />
<br />02/1986 - 01/1987, Project Manager-
<br />Project Engineer, Stone & Webster,
<br />Project Management, Austin, TX
<br />As Project Manager/Project Engineer, I\[r. Eskinazi
<br />directed the technical functions for the engineering and
<br />design of a 300 k\V photO\'oltaic solar plant, and
<br />controlled the project schedulc and cost. The work
<br />scope included the preparation of specifications for
<br />etluipment procurement and construction contracts,
<br />contract management, and the design and operation of a
<br />data actluisition system.
<br />
<br />The following is a summary of key projccts:
<br />
<br />Project Manager, City of Austin, TX PV-300, ARCO
<br />Solar, Inc., Austin, TX, 02/1986 - 01/1987. Design
<br />and construction of a photo\"oltaic solar plant.
<br />
<br />i\ccomplishmcnts:
<br />Directed the technical functions for the cngineering and
<br />design of a 300 k\\' photovoltaic solar plant, and
<br />controlled the project cost and schedulc.
<br />
<br />SHAW ENVIRONMENTAL. INC.
<br />
<br />NESSIM S. ESKINAZI 4
<br />
<br />06C122006T
<br />
|