|
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />I.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
<br />QUALIFICATIONS FOR THIS CONTRACT
<br />(Presenl as many projects as requested by the agency, or 10 projects, If not specified.
<br />Comolete one Section F for each oroiect.J
<br />21. TITLE AND LOCATION (City and State)
<br />Midtown Miami and Related Parks
<br />Miami, FL
<br />
<br />20. EXAMPLE PROJECT KEY
<br />NUMBER
<br />
<br />4
<br />
<br />22. YEAR COMPLETED
<br />PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
<br />2006
<br />
<br />23. PROJECT OWNER'S INFORMATION
<br />
<br />a. PROJECT OWNER
<br />Midtown Equities, LLC
<br />
<br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE
<br />TO THIS CONTRACT (Include scope. size, and cost)
<br />
<br />b. POINT OF CONTACT NAME
<br />Daniel K. Pfeffer, President
<br />
<br />c. POINT OF CONTACT TELEPHONE NUMBER
<br />(212) 726-077
<br />
<br />
<br />~~
<br />
<br />C!D D U r)~!!I
<br />;:::
<br />
<br />AWARD
<br />First Place - Outstanding Redevelopment
<br />Study, Gold Coast Section of the American
<br />Planning Association
<br />
<br />Located in the heart of Miami, this 56-acre
<br />brownfield is the largest redevelopment
<br />project in the City. Kimley-Horn and Urban
<br />Resource Group, in association with
<br />Zyscovich, Inc., worked with the
<br />architectural design team to develop a truly
<br />urban mixed-use master plan that can
<br />support 4,500 residential units; 1.2 million
<br />square feet of commercial development; and
<br />offices and parks. The design includes
<br />nearly 12,000 linear feet of urban
<br />streetscapes, a linear park system, an urban
<br />plaza, and a series of vest pocket parks.
<br />Kimley-Horn authored streetscape design guidelines for the project and prepared a Regional Activity Center (RAC) justification
<br />report to increase DRI thresholds. We have designed all public infrastructure including roadways, utilities, traffic, landscape, and
<br />urban planning. To date. the firm has also been the landscape architect and civil engineer of record for all private-sector
<br />developments within the project. Cost: $26 million.
<br />
<br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
<br />
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
<br /> Kimley-Horn and Associates, Miami Beach, FL Urban design, land use and comprehensive
<br /> Inc. planning, landscape architecture, civil engineering,
<br />a. utility engineering, environmental engineering,
<br /> project management, funding, traffic engineering
<br /> and transportation planning
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
<br /> Kimley-Horn and Associates, Miami, FL Utility profiling/coordination, permit scheduler, site
<br /> Inc. inspection and calculations, water/sewer design,
<br />b. COD reports, drainage report/exhibits, OPC, zoning
<br /> approval, capital improvements, public right-of-way
<br /> improvements, sight triangulation, environmental
<br /> restoration analysis, shop drawing reviews
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
<br />c. Kimley-Horn and Associates, Jacksonville, FL Brownfield remediation; hydrogeology
<br /> Inc.
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
<br />d. Kimley-Horn and Associates, Vero Beach, FL Roadway design
<br /> Inc.
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
<br />e. Kimley-Horn and Associates, Port St. Lucie, FL Design
<br /> Inc.
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
<br />e. Kimley-Horn and Associates, Atlanta, FL Traffic analysis
<br /> Inc.
<br />
|