Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Presenl as many projects as requested by the agency, or 10 projects, If not specified. <br />Comolete one Section F for each oroiect.J <br />21. TITLE AND LOCATION (City and State) <br />Midtown Miami and Related Parks <br />Miami, FL <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />4 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) <br />2006 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Midtown Equities, LLC <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE <br />TO THIS CONTRACT (Include scope. size, and cost) <br /> <br />b. POINT OF CONTACT NAME <br />Daniel K. Pfeffer, President <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(212) 726-077 <br /> <br /> <br />~~ <br /> <br />C!D D U r)~!!I <br />;::: <br /> <br />AWARD <br />First Place - Outstanding Redevelopment <br />Study, Gold Coast Section of the American <br />Planning Association <br /> <br />Located in the heart of Miami, this 56-acre <br />brownfield is the largest redevelopment <br />project in the City. Kimley-Horn and Urban <br />Resource Group, in association with <br />Zyscovich, Inc., worked with the <br />architectural design team to develop a truly <br />urban mixed-use master plan that can <br />support 4,500 residential units; 1.2 million <br />square feet of commercial development; and <br />offices and parks. The design includes <br />nearly 12,000 linear feet of urban <br />streetscapes, a linear park system, an urban <br />plaza, and a series of vest pocket parks. <br />Kimley-Horn authored streetscape design guidelines for the project and prepared a Regional Activity Center (RAC) justification <br />report to increase DRI thresholds. We have designed all public infrastructure including roadways, utilities, traffic, landscape, and <br />urban planning. To date. the firm has also been the landscape architect and civil engineer of record for all private-sector <br />developments within the project. Cost: $26 million. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> Kimley-Horn and Associates, Miami Beach, FL Urban design, land use and comprehensive <br /> Inc. planning, landscape architecture, civil engineering, <br />a. utility engineering, environmental engineering, <br /> project management, funding, traffic engineering <br /> and transportation planning <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> Kimley-Horn and Associates, Miami, FL Utility profiling/coordination, permit scheduler, site <br /> Inc. inspection and calculations, water/sewer design, <br />b. COD reports, drainage report/exhibits, OPC, zoning <br /> approval, capital improvements, public right-of-way <br /> improvements, sight triangulation, environmental <br /> restoration analysis, shop drawing reviews <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. Kimley-Horn and Associates, Jacksonville, FL Brownfield remediation; hydrogeology <br /> Inc. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. Kimley-Horn and Associates, Vero Beach, FL Roadway design <br /> Inc. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. Kimley-Horn and Associates, Port St. Lucie, FL Design <br /> Inc. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. Kimley-Horn and Associates, Atlanta, FL Traffic analysis <br /> Inc. <br />