My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
four inches (24 ") of looped -wire slack at valves and snake wires in trench <br />to allow for contraction of wires. Tie color -coded wires in bundles at ten - <br />foot (10') intervals. The wire shall be laid in the trench prior to the <br />installation of the pipe. The wire must be beneath and six inches (6 ") to <br />the side of the mainline pipe. <br />B. All underground wire splices shall be made at electric valves in valve <br />boxes, using 3M DBY connectors per manufacturer's instructions. <br />C. All wire passing under existing or future paving or construction shall be <br />encased in Schedule 40, PVC conduit extending at least twelve inches <br />(12 ") beyond edges of paving and stabilized for construction. Any wire in <br />plant beds shall be placed in three - fourths inch (3/4 "), Class 160, PVC thirty <br />six -inch (36 ") minimum burial. Installation procedures shall conform to all <br />local codes. <br />D. Electrical connections to electrical control devices shall be made with 3M <br />DBY connectors, or equal. <br />E. All electrical installation shall comply with all applicable building code <br />electrical requirements and standards. <br />3.06 VALVE AND VALVE BOX INSTALLATION <br />A. Gate Valves: The IC shall install as located and detailed on the drawings. <br />B. Quick - Coupling Valves: Shall be installed on mainline pipe in areas <br />shown on the drawings. The connection between the mainline and quick - <br />coupler valve shall be with a threaded Schedule 80, PVC pipe and a triple - <br />swing joint. <br />C. Electric - Control Valves: Shall be installed in specified valve boxes at the <br />depth specified on the drawings. The valve box shall have six -inch (6 ") <br />layer of three - fourths -inch (3/4 ") pea gravel installed below the bottom of <br />the valve. The valve shall be connected to the mainline with Schedule 80, <br />PVC extensions as necessary to ensure valve is properly positioned in the <br />valve box as shown in the details. Electric - control valves shall be installed <br />where shown and grouped together where practical. The IC shall place no <br />closer than three feet (3') from edges of sidewalks walk edges, buildings <br />and walls, and no closer than seven feet (7') from the back -of -curb along <br />roadways or centerlines of swales. The IC shall adjust the valve to <br />provide flow rate or rated - operating pressure required for each sprinkler <br />circuit. <br />I. In the event that the valve box does not extend to the base of the electric - <br />control valve because of specific field conditions or complications, as <br />07/06 02810 -19 05 -5564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.