My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.10 WARRANTY <br />A. The IC shall fully warrant the landscape irrigation system for a period of <br />one (1) year after the written Final Acceptance and will receive a written <br />confirmation from the LA that the warranty period is in effect. <br />B. During the warranty period, the IC will enforce all manufacturer's and <br />supplier's warranties as if made by the 1C himself. Any malfunctions, <br />deficiencies, breaks, damages, disrepair, or other disorder due to <br />materials, workmanship, or installation by the IC and his suppliers shall be <br />immediately and properly corrected to the proper order as directed by the <br />Owner and /or LA. <br />C. Any damages caused by system malfunction shall be the responsibility of <br />the IC who shall make full and immediate restoration for said damages. <br />3.11 SUBSTANTIAL COMPLETION, INSPECTION AND ACCEPTANCE <br />A. Inspection of the entire project or designated portions thereof shall be <br />made upon written request of the IC. At that time, if all work is satisfactory <br />and complete according to the conditions of the contract, the OAR shall <br />declare the work substantially complete. <br />B. The IC's written request for review of the work or any designated portion <br />thereof shall be received by the OAR at least five (5) days before <br />anticipated date of inspection. <br />C. Plants that have died or are in unhealthy or badly- impaired condition on <br />inspection (as a result of the IC's work only) shall be treated or replaced <br />within fourteen (14) days at no additional cost to the Owner. <br />D. Replace rejected plants within two (2) weeks of inspection. <br />E. Substantial completion of the work for the entire project, or designated <br />portions thereof, shall constitute the beginning of the guarantee period. <br />F. The IC's responsibility for maintenance shall extend through the entire <br />guarantee /warranty period (i.e., one (1) year from substantial completion). <br />END OF SECTION <br />07/06 02810 -22 05 -5564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.