My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 2.02 FINISH SCHEDULE <br />A. Finish schedule is shown at the end of this Section. <br />PART 3 - EXECUTION <br />3.01 PREPARATION OF SURFACES <br />' A. No cementitious finish operations shall commence until substrate has <br />been inspected and approved by the applicator. Remove all <br />efflorescence, laitance, loose concrete, and foreign material by effective, <br />approved means. Acid etching and neutralizing or sandblasting may be <br />required to obtain acceptable substrate. <br />3.02 GENERAL INSTALLATION REQUIREMENTS <br />A Two coat plaster work shall conform to ANSI Standard A42.3 for portland <br />cement plastering except as amended herein. Cementitious finish mixing <br />and application shall conform to manufacturer's instructions as approved. <br />1 B. Installation shall be done only by mechanics skilled in the application of <br />these systems. <br />C. Concrete, except for installing patching, shall be allowed to cure 30 days <br />before application of cementitious finish system. <br />D. Warm Weather Requirements: Protect plaster and finish against uneven <br />and excessive evaporation and from strong flows of dry air, both natural or <br />artificial. Apply and cure plaster as required by climatic and job conditions <br />' to prevent rapid dry out. Provide suitable coverings, moist curing, barriers <br />to deflect sunlight and wind, or combinations of these, as required. <br />E. No materials which are caked or lumpy, or which are contaminated with <br />foreign materials shall be used. No retarding or accelerating agents will <br />be allowed in mixes without approval of Engineer. Minimum temperature <br />at application and 24 hour thereafter shall be 50 degrees F. <br />F. Hand apply plaster to the specified thickness. Machine application will not <br />be allowed. <br />G. Apply plaster and finish to an entire panel, or substrate unit with <br />interruptions occurring only at openings or control joints. <br />H. Place mixed plaster and finish within a maximum of 1 1/2 hours after <br />mixing, except during hot, dry weather, reduce maximum placing time as <br />I <br />07/06 09820 -3 05 -5564 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.