My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />C! <br />t <br />t <br />11 <br />required to prevent premature stiffening of plaster. Do not retemper <br />stiffened plaster with additional water or bonding agent. <br />3.03 CEMENTITIOUS FINISH APPLICATION <br />A Manufacturer's instructions for mixing and application as approved shall <br />be strictly followed. <br />B. Patching: <br />1. Patching shall be done with mortar specified above and where <br />required on concrete, as specified in Section 03300. <br />2. Patch tie cone holes, cracks and other defects in the concrete <br />substrate required to be patched. Allow to cure 7 days before <br />applying finish. This work is to be done by the Contractor. <br />C. Cementitious finish shall be mixed with bonding agent and water in the <br />approved mix proportions. <br />D. Apply with trowel a thin tight coat of finish firmly filling all voids, and when <br />tight coat is firm to touch, double back with more material and level to <br />bring the wall to true and level plane. <br />E. Application shall be at a rate to provide a 1/4 inch thickness minimum with <br />sufficient material used to fill voids and surface imperfections and to hide <br />joints in CMU walls. <br />F. When surface has set, so finish will not roll or lift, float surface uniformly to <br />obtain the approved sand finish. Use dry or slightly dampened float to <br />avoid adding moisture to the surface cementitious finish. <br />G. Finish shall be light textured finish on all exterior masonry and concrete <br />surfaces. <br />H. Cementitious Thoroseal System finish shall have 28 days minimum drying <br />time before the application of any type of masonry paint. <br />3.04 CLEANUP <br />07/06 <br />i <br />A. At the conclusion of the work of this Section, remove all debris, cartons, <br />cans and work equipment, and leave the premises in a neat and orderly <br />condition. <br />END OF SECTION <br />09820 -4 05 -5564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.