My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(06-12-02) General Engineering Consultants
>
Responses
>
Calvin Giordano & Assoc.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:15:21 AM
Creation date
1/24/2011 3:18:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
06-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Calvin, Giordano & Associates, <br />;x w <br />a U . <br />Lift Station No. 14 Rehabilitation, Miramar, Florida. CGA replaced the existing pumps in the <br />adjacent dry well with new submersible, non -clog pumps in the wet well. The wet well was <br />rehabilitated to prevent infiltration. The station was bypassed during construction, which <br />also included installation of two new submersible pumps, emergency electrical <br />connections and site landscaping. <br />Lift Station Renovations, Hollywood, Florida. CGA conducted an investigation of 12 lift <br />stations identified by the City's maintenance personnel as problematic. Corrosion prob- <br />lems as well as pump and motor performance problems were identified. CGA <br />recommended rehabilitation for each station. All stations required cleaning and painting <br />plus removal of existing lead paint. Several stations required new impeller and rotating <br />elements in the pumps. Others required pump and motor replacement and structural <br />repair. The dry well was abandoned at one station, and the pumps were put in the wet <br />well. <br />Master Lift Station No. 19 Rehabilitation, Davie, Florida. CGA installed a new wet well and <br />replaced existing pumps with self - priming, centrifugal, non -clog pumps. The capacity of <br />the station was designed to allow use in the low -flow pressure initial condition and the <br />Client <br />Miramar, Hollywood, and <br />Davie, Florida <br />Project Date <br />Various <br />Project Value <br />Various <br />Services Provided <br />Engineering and <br />Construction Management <br />Key Personnel <br />Karl Kennedy, PE <br />
The URL can be used to link to this page
Your browser does not support the video tag.