Laserfiche WebLink
WIA <br />Civil Works, Inc. <br />Miami - Ft. Lauderdale - Orlando <br />WBE /DBE firm 305 -448 -5955 954 - 344 -6568 407 - 339 -0040 <br />www.civilworks.com cwi @civilworks.com <br />VAUGHN SOARES, P.E. WATER AND SEWER <br />EDUCATION: B.S. Civil Engineering, Florida International University <br />Graduation - 1994. <br />PROFESSIONAL REGISTRATION: Florida P.E. No. 56912 <br />PROFESSIONAL AFFILIATIONS: American Society of Civil Engineers <br />Florida Engineering Society <br />Institute of Transportation Engineers <br />American Society of Highway Engineers <br />EXPERIENCE: <br />Mr. Soares has more than thirteen years of civil and environmental engineering experience in the <br />design, preparation and management of engineering projects including stormwater drainage, airports, water <br />and sewer, roadways, drainage, commercial parking lots, signalized intersections and transit rail stations. <br />He has prepared plans to FDOT, Miami -Dade, WASD, DERM, Broward and Orange County standards. <br />Some of his individual project experience includes: <br />SW 184 Street 24 -inch Force Main - Miami -Dade Water and Sewer - This project included the design <br />of one -mile of a 24 -inch sanitary force main to be constructed as part of SW 184`h Street MDPW <br />Roadway Improvement project. The project Design included documentation of existing utilities, <br />re- design of the previous plans accommodate the roadway design and new drainage structures. <br />CWI was a subconsultant to LPA for this project. <br />Bermuda Village - Coral Gables, FL - This project included the paving, grading, drainage, water and <br />sewer design for a 30 -unit residential development. The project included 1400 If of 6" sanitary <br />force main, 6801f of 8' water main and gravity sewer. <br />Biscayne 36" Force Main, WASD - Project Manager responsible for the coordination, design, scheduling, <br />and production of the existing utilities base CAD file and maintenance of traffic plans for <br />approximately 3 miles of 36" diameter force main. Responsibilities included construction <br />phasing of force main across three FDOT right -of -ways and through three signalized intersections. <br />Sunny Isles 48" Force Main, WASD- Project Manager responsible for the development, coordination, <br />design, and production of the existing utilities base CAD file, and maintenance of traffic plans for <br />approximately 1 mile of 48" diameter force main along Sunny Isle Boulevard from the <br />Intracoastal Waterway to US -1. Project included coordination with FDOT and DERM. <br />Lexus of Kendall - Project Manager responsible for civil site plans for new Toyota Lexus Sales Offices <br />and parking garage. Construction documents included new concrete paving, canal bank restoration, <br />water and sewer, retro - fitting new sanitary lift station, as well as coordinating permitting through <br />DERM, WASD, FDOT, SFWMD, and Village of Pinecrest. <br />Canal Relocation and Utility Modifications, Miami International Airport - Senior Design Engineer <br />responsible for the coordination, design and preparation of construction documents for the <br />relocation of 600 LF of the Outfall 2 Canal, as well as the extension of existing box culverts and <br />pipe arches to accommodate the relocation of CSX Railroad Tracks. Included in this project are <br />the relocation of approximately 100 L.F. of 12 -inch water main and 8 -inch sanitary force main <br />Civil Works, Inc. 10 N.W. 42nd Avenue, Suite 200, Miami, FL 33126 Ph: 305 -448 -5955 Fax: 305 -448 -5466 <br />