Laserfiche WebLink
Vaughn Soares, P.E. WATER AND SEWER - 2 <br />in conflict with the proposed culvert extension. Also included are 750 LF of 16 -inch sanitary <br />force main and 1100 LF of 24 -inch water main with a canal crossing. Plans included tie -in <br />details, canal crossing details, and standard water and sewer details, as well as water and sewer <br />permitting through HRS, DERM, and WASD. <br />Ives Estates Youth Complex Phase I - Miami -Dade Parks and Recreation - Senior Design Engineer <br />responsible for the development and design of construction documents for Phase I of Ives Estates <br />Youth Complex. Project included a lighted parking lot, a lighted soccer field, two lighted ball <br />fields, a recreation center and a maintenance building, 1500 LF of 16" water main, 2100 LF of <br />6" force main, sanitary lift station, electrical and communication infrastructure. Permitting and <br />coordination with Solid Waste, DERM, and FDEP due to site conditions. (Closed Ojus Landfill). <br />South Florida Water Management District Headquarters Master Plan, West Palm Beach - Senior <br />Design Engineer for a 29 -acre Headquarters Master Plan. Proj ect planning included water, fire and <br />sanitary improvements, as well as parking layout. <br />Hollywood Library - Senior Design Engineer for the site development for the new Hollywood Branch <br />Library. Responsibilities included parking lot layout, modifications to Sterling Road, water, <br />sanitary, fire line, drainage and permitting through the City of Hollywood, Broward County, DPEP <br />and FDOT. <br />Airport Rescue and Fire Fighting Facility, Fort Lauderdale - Hollywood International Airport - <br />Senior Design Engineer for the design and preparation of civil construction documents for a new <br />midfield fire fighting facility. Included in this new site was an airside apron and employee parking <br />lot, as well as drainage design. Both sanitary and water were piped across the taxiway and <br />Concourse C apron. <br />Big Cypress - National Park Service - Collier County - Project Manager responsible for the <br />coordination, scheduling, cost analysis, and design for a new visitors center for the Big Cypress <br />Reserve. This design/build project included a new parking lot, water, sanitary lift station, and <br />paving, grading and drainage, as well as a pedestrian bridge crossing over a canal. Coordination <br />required with SWFWMD, FDEP, FDOT, ACOE, and Collier County. <br />West Perrine Park - Miami -Dade Parks and Recreation Department - Project Manager responsible <br />for the coordination, civil design, and plans production for the addition of a new recreation center, <br />parking lot, and walkways for West Perrine Park. Plans included the drainage report, paving, and <br />grading, site layout, striping, water and sanitary design. Coordinated with MDPW, DERM, and <br />WASD. <br />Ives Estates Youth Complex Master Plan - Miami -Dade Parks and Recreation - Senior Design <br />Engineer responsible for the coordination of utility companies for infrastructure improvements to <br />establish a new 84 acre park and regional offices complex on the closed Ojus landfill. <br />Constructability issues were coordinated with DERM, FP &L, BellSouth, as well as Musco <br />Lightning. The final site will have three lighted parking lots, four lighted soccer fields, five lighted <br />ball fields as well as a large recreation center and a maintenance facility. <br />Harbour House, Miami -Dade County - Project Engineer for site improvements to the Harbour House <br />Towers. Responsibilities included parking lot layout, drainage, system design with gravity and <br />deep injection wells, and sanitary system modifications, as well as permitting through Miami -Dade <br />County, DERM, FDOT and the Town of Bal Harbour. <br />Broward County Port Authority at Port Everglades - CWI provided roadway and sanitary systems <br />assessment for the Broward County Port Authority at Port Everglades as part of the Bond <br />Engineer's annual review. This annual project scope included data collection, a matrix analysis <br />of conditions, cost estimates and prioritizing of rehabilitation needs. <br />VSWS06.wpd <br />ICivil Works, Inc. 10 N.W. 42nd Avenue, Suite 200, Miami, FL 33126 Ph: 305 - 448 -5955 Fax: 305 - 448 -5466 <br />